My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TFR Enterprises Inc
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-04-01) Disaster Debris Management and Disposal Services
>
Responses
>
TFR Enterprises Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2023 12:53:29 PM
Creation date
5/17/2023 12:48:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Inspection Tower Construction Diagrams <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 4’ <br /> 10’ <br />Min. 2’ <br />Min. 3’ <br />Worktable, Min. <br />4’x2.5’ ¾” plywood <br />w/4 corner <br />support <br />Treated 6 x 6, <br />10’ ground-to- <br />floor, anchored <br />2’ into ground <br />with concrete <br />Floor area 8’ x 8’, 2x8 <br />joists, 16” O.C. w/ ¾” <br />plywood floor supported <br />by 4- 6”x6” posts anchored <br />2’ into ground with <br />concrete <br />Corrugated metal <br />roof, 7’ minimum <br />above floor with 2’ <br />overhangs <br /> <br />4’ high, ½” <br />plywood <br />walls <br />Min. 3’ <br />additional <br />height <br /> <br />Symmetrical <br />wooden stairs <br />w/top rail 30-34” <br />and midrail <br />ITB No. 23-04-01 <br />Disaster Debris Management and Disposal Services <br />80
The URL can be used to link to this page
Your browser does not support the video tag.