My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley Horn
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Kimley Horn
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:57:02 AM
Creation date
8/19/2014 10:59:22 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />Architectural, Landscape Architectural, <br />Engineering and Land Surveying Firms Only (CCNA) <br />RFO No. 14 -07 -02 <br />® Detailed Work Plan <br />® Kimley -Horn project managers develop very detailed work plans that include specific task items for the duration of all projects with <br />associated team members' responsibilities and corresponding time. The work plan defines who, what, when, where, and how for <br />® all project tasks. This level of detail requires the project manager and the team members to think the project through and develop <br />® a plan that they are then responsible for implementing. This work plan process also helps to ensure the correct team members are <br />® selected for the work and minimizes problems through early detection, experience, and expertise. <br />® High Level of Communication <br />® In addition to assembling the right team, the project manager must communicate <br />with the entire team to be aware of the project status, adjust any work plan <br />® issues if they occur, and keep the client informed at all times. This level of <br />® communication is key to a successful project and an effective method for <br />® identifying any potential problems before they become serious. Early detection <br />followed by immediate action is critical. If a problem does develop, the best <br />® approach is to research the issue to determine the severity of the problem, <br />® formulate a plan to address the issue with the appropriate team members, <br />® and then immediately present the client with the best resolution —one that is <br />supported by clear and concise documentation so that if direction is required by <br />® the client, the necessary facts are available for an informed decision. <br />It <br />We have carefully selected a core <br />team of professionals to provide a <br />high level of responsiveness to the <br />City of Sunny Isles Beach, both in <br />terms of exceptional local experience <br />and support, and extensive technical <br />experience in the disciplines you <br />require. <br />Value Engineering <br />Kimley -Horn has a long history of achieving successful project completion through a combination of effective project management <br />and technical expertise. We know that when you select an engineering consultant, you are really choosing people who offer you <br />technical expertise, extensive hands -on experience with similar projects, and a demonstrated record of quality and responsiveness <br />that will make your project a success. We have carefully selected a core team of experienced professionals to provide a high level <br />of responsiveness to the City of Sunny Isles Beach, both in terms of exceptional local experience and support, and extensive <br />technical experience in the disciplines you require. <br />With that expertise in place, the Kimley -Horn team <br />has a philosophy of constant value engineering by <br />focusing on better decisions, better information, <br />better analysis, cost reductions, increased <br />productivity, and accurate deliverables throughout <br />all project steps. Value engineering is a key <br />factor for developing successful projects that <br />transition from study to design, and from design to <br />construction. The challenges associated with each <br />project task are solved creatively and effectively. <br />Each step is reviewed by the most qualified <br />professional to assure the highest level of value to <br />the City of Sunny Isles Beach. <br />Kimley -Horn has also worked with many municipalities <br />governmental agencies to provide peer reviews and w <br />engineering reviews. Our team's expertise can be app <br />designs completed or partially completed by other eng <br />companies. Our experience in all facets of municipal H <br />be applied to any existing project with positive results <br />value to the client. The common goal of the Kimley -Ho <br />is to provide the City of Sunny Isles Beach with the me <br />throughout every aspect of this project. <br />RM a -07-0 <br />OY260021.14-0 Sm 5MS deal: GNn:ag Pm'ess'imal Services.vHO <br />KimleyoHorn <br />
The URL can be used to link to this page
Your browser does not support the video tag.