Laserfiche WebLink
1 <br />Architectural, Landscape Architectural, <br />Engineering and Land Surveying Firms Only (CCNA) <br />® 2. Final Design Phase <br />® At this point, a preferred design has been selected. The Kimley -Horn team will prepare complete construction plans suitable for <br />competitive bidding. Kimley -Horn will also assist the City in developing their contract document format. Probable construction <br />® costs will be updated as the project details are developed. Pre - application meetings will be held with review agencies and permit <br />® applications will be prepared and submitted. <br />® Access plans for adjacent properties and maintenance of traffic issues will be considered. If available, applications for grants can <br />® be submitted again, this time for the construction phase. <br />® Milestones during the Final Design Phase include: <br />® • A kick -off meeting to authorize the start of final design, confirmation of project scope, objectives, and schedule <br />® • Design reviews at completion of 30 %, 60 %, and 90% plans <br />• A public meeting to present the project design, updates, schedule, and funding plan <br />® • Permit applications <br />ID <br />Deliverables during this phase include complete construction documents, drawings, and specifications suitable for competitive bidding. <br />3. Construction Phase <br />The final step will be to build the project. Kimley -Horn will provide bidding services and will administer the construction contract. <br />Using us to provide resident project services during construction has helped protect the City against defects in materials or <br />workmanship in the construction. Kimley -Horn understands what the City requires to successfully close projects to resident <br />satisfaction. Milestones during this phase include: <br />• Advertisement of the construction project <br />• Notice to proceed with construction <br />• Contract administration <br />• On -site observation <br />• Certification that construction is complete and in compliance with the plans and specifications <br />Deliverables in this phase include complete as -built record drawings and construction certification. While these project milestones <br />are the key steps in successful project completion, we believe the best -run projects are those with effective communication. We <br />have accomplished this with the City by providing regular status reports (with meetings, when desired) emphasizing thorough <br />coordination and communication with the City. <br />QA/QC Process for Deliverables <br />i <br />. -- �r <br />Tom° F n.rri.m n / <br />i <br />S wwav I <br />•irmr <br />i <br />. Po 14d,-0 <br />OY2wt.1:-0 sssy Lsles xr, Cor r.:ug arJ=aio -,I Servars;,w <br />Quality Assurance /Quality Control Q( A/QC) <br />Quality control begins with the team assigned to undertake this project. <br />Recognizing the critical importance of careful quality control, we have <br />developed an extensive internal quality control program with a 200 - <br />page manual to guide this process, which is routinely implemented on <br />our projects. There will be no learning -curve impact on quality for the <br />Kimley Horn team. <br />Our approach to frequent communication and to quality assurance/ <br />quality control will relieve City staff of any significant project review <br />efforts. A QA/QC review of project solutions and analysis, together with <br />design reviews, will ensure a top quality deliverable for the City. Our <br />team's experience in coordinating and conducting public meetings and <br />information sessions will also relieve staff of a considerable burden. <br />The ultimate goal of each project is to provide a safe and satisfactory <br />outcome for your citizens. <br />Our formal QA/QC program is based upon assigning experienced <br />senior professionals who are otherwise qualified to manage a particular <br />project, to serve in an independent quality control role. John Potts, <br />Kimley> ))Horn <br />4 -4 <br />