My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley Horn
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Kimley Horn
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:57:02 AM
Creation date
8/19/2014 10:59:22 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
xl <br />Architectural, Landscape Architectural, <br />Engineering and Land Surveying Firms Only (CCNA) <br />RFQ No. 14 -07 -02 <br />® project budget. We track the budget on a percent - complete basis in order to measure performance during each accounting report <br />® period. Project budget status reports are accessible via our intranet. <br />® Our project manager, Gary Ratay, P.E., will develop a work plan for each assignment that specifies the scope of the work, the <br />task schedule, its budget, and the staff assigned to fulfill the requirements of the scope of work. We will work with City staff to <br />® agree on the necessary work effort, fee, schedule, and deliverables. The process will commence upon receipt of the City's notice <br />® to proceed at which point the project manager determines the most appropriate review /design team members to be assigned. Our <br />® approach will consist of the following proven fundamentals: develop a clear understanding of what the project is to accomplish, <br />develop a comprehensive work plan and schedule, set weekly milestones that support the larger milestones, review milestones <br />® with the project team on a weekly basis, involve stakeholders as integral members of the team, coordinate with other consultants, <br />® and create an atmosphere that encourages clear communications and teamwork. The work plan will be continually monitored and <br />® revised as the project proceeds to meet time and budget restraints. <br />® The work plan is also the tool for establishing staffing for the project and identifying the anticipated labor requirements of each <br />phase. The work plan is reviewed frequently throughout the project and is used in conjunction with our in -house "cast- ahead' <br />® process to forecast project workloads. This program requires project managers to forecast, on a weekly basis, their staffing needs <br />® for the ensuing week. This "cast - ahead" process is followed by a weekly conference call among company resource managers to <br />® identify who is overloaded and who needs work. Resources are reallocated on a weekly basis as needed to meet client schedules. <br />® A similar process is conducted monthly as project managers forecast their resource needs during the next six months. This <br />information is used to assess hiring needs. Conducted throughout the entire 2,200 - person firm, these extra efforts are performed to <br />® make sure our project managers have the resources they need to meet our clients' needs. Kimley -Horn has a long and successful <br />® history of meeting the budget and scheduling demands of public sector projects and that success is reflected by the volume of <br />® repeat business we enjoy. <br />® Kimley »)Horn <br />® OY ,1, <br />orzsaoz�.1ao ss:.y i� sue, ca:.::. -g Psi sz�:ma 4-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.