My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley Horn
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Kimley Horn
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:57:02 AM
Creation date
8/19/2014 10:59:22 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P.L O R�LD'b <br />August 1, 2014 <br />Public Works Department <br />Alfredo Quintero Jr., EI, CFM, CGC, CCC <br />Public Works Director <br />ISA Certified Arborist <br />® Kimley -Hom and Associates, Inc. <br />® 600 N Pine Island Road, Suite 450 <br />Plantation, FL 33324 <br />® RE: Letter of Reference <br />® To whom it may concern: <br />® My office is submitting this letter of reference in support of Kimley -Horn and Associates, Inc. and the <br />is high quality of its services. Since 2007, the Town of Cutler Bay has utilized the expertise of Kimley -Horn <br />® as our stormwater consultant. Kimley -Horn has worked closely with the Town on the following <br />® stormwater planning work: <br />® . Kimley -Hom developed a stormwater master plan to address flood protection activities for its <br />® residents and to protect the environmental quality of its canals. <br />® • Kimley -Horn also developed a stormwater management report to assist the Town in creating a <br />stormwater utility, a capital improvements plan, and an operation and maintenance program <br />® associated with the stormwater system. <br />® • Kimley -Horn assisted the Town in joining the National Flood Insurance Program, giving the <br />community access to federally- funded flood insurance. Kimley -Horn also submitted applications <br />® and a program approach for an anticipated Community Rating System rating of 6. Although the <br />® total planning cost was $230,000, Kimley -Hom assisted the Town in obtaining a $200,000 grant <br />through the South Florida Water Management District which significantly offset the Town's <br />® costs. <br />® Kimley -Horn has also assisted the Town in implementing the capital improvement plan with roadway and <br />drainage improvement projects that included funding assistance, design, permitting, bidding assistance, <br />® and construction phase services. The successfully completed projects include: <br />® • Cutler Ridge Elementary School Area Roadway and Drainage Improvement Project — <br />® Completed October 2009. Kimley -Horn provided roadway restoration/resurfacing, drainage <br />® improvements and permitting in the Cutler Ridge Elementary School area. The project included <br />® curb and gutter, new sidewalk, and site restoration. Construction phase services were also <br />provided to expedite the project for completion before the opening of school and to minimize <br />® adverse impacts to the community. Contract amount: $60,000. Total construction cost (Phase I <br />® and II estimate/ Phase I only actual): $550,0005140,000 <br />• Saga Bay Roadway and Drainage Improvement Project — Completed March 1010. <br />® Kimley -Horn provided similar professional services for this neighborhood roadway and drainage <br />® improvement project. Contract amount: $64,000. Total construction cost (estimated/actual): <br />$650,000/$245,000 <br />FGBC 10720 Caribbean Boulevard, Suite 105 • Cutler Bay, FL 33189 • 305 -234 -4262 • www.cutierbay- fl.gov <br />RFO <br />® Kimlley4Hom <br />5-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.