My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3522
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2023 12:37:33 PM
Creation date
8/2/2023 12:22:31 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3522
Date (mm/dd/yyyy)
07/20/2023
Description
1st Amendment to the project agreement w/ Rodriguez Architects, Inc. to provide addt'l svcs at Bella Vista Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
best of the Consultant's knowledge, information and belief, the quality of Work is in <br />accordance with the Contract Documents (subject to an evaluation of Work for <br />conformance with the Contract Documents upon Substantial Completion, to the results or <br />any subsequent tests required by or performed under the Contract Documents, to minor <br />deviations from the Contract Documents correctable prior to completion, and to any <br />specific qualifications stated in the Project Certificate for Payment); and that the Contractor <br />is entitled to payment in the amount certified. However, the issuance of a Certificate for <br />Payment shall not be a representation that the Consultant has made any examination to <br />ascertain how or for what purpose the Contractor has used the monies paid on account of <br />the Contract Sum. <br />2.5.14 Should disagreement occur between the Contractor and Consultant over acceptability of <br />work and conformance with the requirements of the specifications and plans, the Project <br />Director shall be the final judge of performance and acceptability. <br />2.5.15 All interpretations and decisions of the Consultant shall be consistent with the intent of, <br />and reasonably inferable from, the Contract Documents, and shall be in writing or in <br />graphic form. <br />2.5.16 The Consultant's decision with the consent of City in matters relating to artistic effect shall <br />be final if consistent with the intent of the Contract Documents. The Consultant's decisions <br />on any other claims, disputes or other matters, including those in question between the City <br />and the Contractor, shall be subject to claims provisions provided in this Agreement and in <br />the Contract Documents. <br />2.5.17 The Consultant shall recommend to the City to reject work, which does not conform to the <br />Contract Documents. Whenever, in the Consultant's reasonable opinion, it is necessary or <br />advisable to insure conformance with the provisions of the Contract Documents, the <br />Consultant shall have authority to require special inspection or testing of Work in <br />accordance with the provisions of the Contract Documents, whether or not such work be <br />then fabricated, installed or completed; but the Consultant shall take such action only after <br />consultation with the Contractor and City. <br />2.5.18 If the Contract Documents specifically require the Contractor to provide professional <br />design services or certifications by a design professional related to systems, materials or <br />equipment, the Consultant shall specify the appropriate performance and design criteria <br />that such services must satisfy. The Consultant shall review Shop Drawings and other <br />submittals related to the Work designed or certified by the design professional retained by <br />the Contractor that bear such professional's seal and signature when submitted to the <br />Consultant. The Consultant shall be entitled to rely upon the adequacy, accuracy and <br />completeness of the services, certifications and approvals performed or provided by such <br />design professionals. <br />2.5.19 The Consultant shall review and approve or take other appropriate action on Change Orders <br />prepared by the Contractor for the City's authorization in accordance with the Contract <br />Documents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.