My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3522
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2023 12:37:33 PM
Creation date
8/2/2023 12:22:31 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3522
Date (mm/dd/yyyy)
07/20/2023
Description
1st Amendment to the project agreement w/ Rodriguez Architects, Inc. to provide addt'l svcs at Bella Vista Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.5 The City shall perform those duties set forth in Sections 3.1 through 3.4 as <br />expeditiously as may reasonably be necessary for the orderly progress of the <br />Consultant's services and of the work. <br />3.6 The City's review of any documents prepared by the Consultant or its subconsultants <br />shall be solely for the purpose of determining whether such documents are generally <br />consistent with the City's construction program and intent. No review of such <br />documents shall relieve the Consultant of its responsibility for the accuracy, adequacy, <br />fitness, suitability and coordination of its work product. <br />SECTION 4 CONSTRUCTION COSTS <br />4.1 If the cost of construction exceeds the cost agreed upon by the City by more than 5% <br />of the lowest bona fide bid or negotiated proposal, the City may (1) give written <br />approval of an increase in such fixed limit, (2) authorize rebidding or renegotiating of <br />the Project, (3) terminate the Project and this Agreement in accordance herewith, or (4) <br />cooperate in revising the Project scope or quality, or both, as required to reduce the <br />construction cost. In the case of (4), the Consultant, without additional charge to the <br />City, shall consult with the City and shall revise and modify the drawings and <br />specifications as necessary to achieve compliance with the cost agreed upon by the <br />City. Absent negligence on the part ofthe Consultant in making its estimates of probable <br />construction cost, providing such modifications and revisions shall be the limit of the <br />Consultant's responsibility arising from the establishment of such construction costs, <br />and having done so, the Consultant shall be entitled to compensation for all other <br />services performed, in accordance with this Agreement. <br />SECTION.5 BASIS OF COMPENSATION <br />5.1 The City shall compensate the Consultant for an amount not to exceed $32,500.00 based <br />on services rendered pursuant to Sections 2.2 through 2.5 and EXHIBIT "1," Scope of <br />Services, of this Agreement by allocating the estimated percentage of work for each of the <br />phases set forth in Section 5.2. Billings for each phase shall not exceed the amount <br />allocated to each phase. <br />5.2 Payment to the Consultant of the sum set forth in Section 5.1 shall be allocated based on <br />the estimated percentage of work completed for each of the following phases: <br />Phase 1. Preliminary Design......................................................................... $3,201.20 10% <br />Phase 2. Construction Documents.............................................................. $22,750.00 70% <br />Phase 3. Bidding-Permitting......................................................................... $1,625.00 5% <br />Phase 4. Construction Administration.......................................................... $4,875.00 15% <br />5.3 Additional services of the Consultant as described in Section 2.6, if any, shall be in an <br />amount not to exceed 5 000.00 compensated as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.