Laserfiche WebLink
City of Sunny Isles — Bella Vista Park <br />New Building <br />Architect's Project No. 2252 <br />Page Two <br />The sub -consultants will be as follows: <br />Structural Engineers: DDA Engineers, P.A. <br />Mechanical, Plumbing and Electrical Engineers: SCM Engineers, Inc. <br />SECTION 3 - BASIC SERVICES (per continuing contract agreement): <br />Phase I — Preliminary Design Services <br />Phase III - Construction Documents Services <br />Phase IV - Bidding and Permitting Services <br />Phase V - Construction Administration Services <br />Not included in Basic Fee: <br />• Testing of existing concrete foundations for adequacy of use <br />• Site Design (City has contracted separately with KEITH for surveying, civil and landscaping design) <br />SECTION 4 — PRELIMINARY ESTIMATE based on initial site information: <br />$500,000.00 +/- <br />SECTION 5 - PROPOSED SCHEDULE: <br />Complete Project Schedule: <br />• Field Investigation —1 week <br />• Design/Construction Documents 100% — 10 weeks <br />• Bidding -Permitting — 4 weeks <br />• Construction Administration — 8 months <br />SECTION 6 - COMPENSATION: <br />The City of Sunny Isles Beach, FL shall pay the Architect for the Basic Services as described above a Stipulated Fixed <br />Sum of Forty -Four Thousand Seven Hundred and Fifty Dollars ($42,750.00). <br />The proposed fee is applicable to each phase of the services as follows: <br />Phase I - <br />Preliminary Design <br />10% <br />$4,275.00 <br />Phase III <br />- Construction Documents <br />70% <br />$29,925.00 <br />Phase IV <br />- Bidding -Permitting <br />5% <br />$2,137.50 <br />Phase V <br />- Construction Administration <br />15% <br />$6,412.50 <br />Total: <br />$42,750.00 <br />Additional Services (if needed — NTE) $5,000.00 <br />Reimbursables (NTE) $1,000.00 <br />Total: $6,000.00 <br />Grand Total: <br />NIRS <br />$48,750.00 <br />RODRIGUEZ ARCHITECTS, INC. <br />