My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3527
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3527
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2023 11:42:51 AM
Creation date
8/25/2023 4:23:39 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
3527
Date (mm/dd/yyyy)
08/17/2023
Description
Payment to Bellsouth Telecommunications, LLC d/b/a AT&T Southeast, for Golden Shores Utility Undergrounding Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
at&t <br />Page 3 of 5 <br />6. Changes in Scope of Work. The parties recognize that this is an 'Actual Cost' contract. <br />"Actual Cost" means that Customer will be provided with a final bill after the completion of <br />all work and agrees to pay that final bill. The final bill will be calculated based on AT&T's billing <br />practices and work performed, which Customer agrees to accept. Customer understands <br />and agrees that the final bill for the Actual Cost may exceed the preliminary cost estimate <br />that has been provided for this work. Consequently, AT&T is not required to provide the <br />Customer with prior notice that the Actual Cost has exceeded the preliminary cost estimate <br />prior to providing the final bill. Further, if the Customer initiates changes in the scope of the <br />work after AT&T has provided the preliminary cost estimate or after executing this <br />contract, the above cost estimate and this contract are null and void. A new cost estimate <br />must be provided based on the new scope of work and a new contract entered. Additionally, <br />if the contractor bid exceeds the estimated contractor costs the applicant will be responsible <br />for additional costs and a change order will be issued for customer approval. Work will not <br />commence until signed change order and additional payment has been received. <br />7. Changes Due to Field Conditions. In the event there exists any conditions in the field <br />that differ from those that existed at the time AT&T provided the quote or from the time <br />the Customer executes the contract, AT&T shall bill and Customer shall pay any additional <br />cost. Field conditions that may alter the cost associated with this work include, but are not <br />limited to, conditions that exist below the surface of the ground and could not have been <br />anticipated at the time of the price quote, above ground barriers, Acts of God affecting the <br />progress or sequencing of the work, labor disputes and other conditions or circumstances that <br />AT&T could not have reasonably anticipated at the time the cost estimate was provided. <br />Differing field conditions are but one example of why the Actual Cost may exceed the <br />preliminary cost estimate. Further, items that Customer has agreed to provide in <br />connection with the Special Construction work, such as (but not limited to) providing <br />conduit and/or handholes, must be suitable to AT&T's purposes. If these items are not <br />suitable or AT&T is forced to acquire or provide them, it will result in increased costs that <br />Customer agrees to pay. <br />8. Customer Obligations. Customer agrees to provide appropriate easements and/or <br />rights of way, as determined by AT&T, to AT&T for its lines and any facilities necessary <br />for the Special Construction work. Further, Customer agrees to provide and place <br />suitable conduit and handholes for AT&T's use in the Special Construction work. Should <br />Customer not provide these items, Customer understands and agrees that it will result in <br />increased costs above the estimate provided, which Customer agrees to pay. <br />9. Time to Complete. Any representation by AT&T, its contractors, or employees that <br />the project will be complete by a certain date or certain time period is strictly an estimate <br />and not binding. All estimated completion dates are subject to changing conditions in the <br />field, changes in the scope of the work, relocation of existing utilities not within AT&T's <br />control, Acts of God, weather delays, labor disputes, contractor disputes, pandemics <br />and other conditions or circumstances could not reasonably anticipate at the time of the <br />estimate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.