My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3562
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3562
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 1:10:31 PM
Creation date
10/2/2023 1:58:08 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3562
Date (mm/dd/yyyy)
09/21/2023
Description
Letter Agreement btwn La Playa Beach Assoc., Inc, and SIB for Coastal construction control line permit for sand placement.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Commission <br />Larisa Svechin <br />Mayor Via Regular U.S. Mail <br />September 20, 2023 <br />Jerry Joseph <br />Vice Mayor <br />La Playa Beach Holdings, LLC <br />Alex Lama <br />c/o Ronald L. Choron <br />Commissioner <br />1300 Brickell Avenue <br />Fabiola Stuyvesant <br />Commissioner <br />Miami FL 33131 <br />Jeniffer Viscarra <br />Commissioner <br />RE: Letter Agreement for Sand Placement Related to St. Regis Residences <br />Dear Mr. Choron: <br />Stan Morris <br />City Manager <br />This Letter Agreement memorializes the agreement entered into, by and between, <br />a lk, Cncur <br />C Clerk, MC the developer of the St. Regis Residences ("Project"), specifically La Playa Beach <br />Associates, LLC ("La Playa"), including its successors and assigns, and the City of <br />Sunny Isles Beach ("City"), for the City's consent to, and approval of, the <br />application for a Coastal Construction Control Line ("CCCL") Permit from the <br />Florida Department of Environmental Protection ("FDEP") for sand placement and <br />other related activities, in accordance with the mandatory express conditions of <br />approval set forth in Resolution Nos. 22-Z-189, 16-Z-158, and 15-Z-156, and <br />pursuant to and contingent upon the additional terms and conditions set forth herein: <br />TERMS AND CONDITIONS: <br />A. A new survey of existing beach conditions must be completed with updated <br />elevations at the time construction plans for the sand placement are developed; and <br />B. The proposed cross sections of the beach at the time the construction plans for the <br />sand placement are developed shall conform to the maximum elevations permitted <br />by Miami -Dade County and the Army Corps of Engineers; and <br />C. La Playa agrees to take all steps necessary, at La Playa's sole expense, to complete <br />the sand placement as per City's approval, inclusive of sand placement below the <br />Mean High Water Line (MHWL) if necessary to maintain the above-mentioned <br />maximum elevations; and <br />D. The sand placement must be approved by all applicable agencies, including but not <br />limited to, the Miami -Dade County Department of Regulatory and Economic <br />Resources ("RER") (formerly the Miami -Dade County Department of <br />Environmental Resources Management "DERM"), and the City; and <br />Letter Agreement for Sand Placement <br />September 20, 2023 <br />Page 1 of 3 <br />CITY OF SUNNY ISLES BEACH GOVERNMENT CENTER • 18070 COLLINS AVENUE- SUNNY ISLES BEACH, FL 33160 • SIBFL.NET <br />
The URL can be used to link to this page
Your browser does not support the video tag.