Laserfiche WebLink
Phase III – Transmission Main Improvements and Replacements – Improving <br />Pressure. This project will address sections of the water transmission and distribution <br />system that need to be replaced or expanded in capacity to reduce pressure loss events, <br />meet compliance with firefighting flow, and to replace aged infrastructure. It will also <br />improve operations at the Operations Center pump station to better maintain pressure <br />throughout the distribution system. The City has already identified two areas for water <br />main rehabilitation in the Eastern Shores and Honey Hill neighborhoods, involving 14,000 <br />linear feet and 8,700 linear feet of pipe replacement, respectively. Further, the City has <br />investigated ten out of approximately fourteen aerial pipe bridge crossings, most of them <br />over canals, and have identified three crossings that require replacement of pipes and piers <br />due to severe deterioration. As the City continues evaluating its hydraulic models and <br />condition assessment reports for each segment of pipeline, it will identify priority areas for <br />pipe replacement within the distribution system. The City plans to issue design-bid-build <br />contracts for this project. <br />SCHEDULE IV-2 <br /> <br />