My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RE-BID ITB # 23-10-01 JOINT PROCUREMENT CENTRAL ISLAND
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-10-01) Re-Bid Joint Procurement with NMB Central Island Drainage Improvements
>
RE-BID ITB # 23-10-01 JOINT PROCUREMENT CENTRAL ISLAND
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 1:29:03 PM
Creation date
10/13/2023 1:26:10 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase III – Transmission Main Improvements and Replacements – Improving <br />Pressure. This project will address sections of the water transmission and distribution <br />system that need to be replaced or expanded in capacity to reduce pressure loss events, <br />meet compliance with firefighting flow, and to replace aged infrastructure. It will also <br />improve operations at the Operations Center pump station to better maintain pressure <br />throughout the distribution system. The City has already identified two areas for water <br />main rehabilitation in the Eastern Shores and Honey Hill neighborhoods, involving 14,000 <br />linear feet and 8,700 linear feet of pipe replacement, respectively. Further, the City has <br />investigated ten out of approximately fourteen aerial pipe bridge crossings, most of them <br />over canals, and have identified three crossings that require replacement of pipes and piers <br />due to severe deterioration. As the City continues evaluating its hydraulic models and <br />condition assessment reports for each segment of pipeline, it will identify priority areas for <br />pipe replacement within the distribution system. The City plans to issue design-bid-build <br />contracts for this project. <br />SCHEDULE IV-2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.