INVITATION TO BID NO. 23-10-01
<br />JOINT PROCUREMEMT
<br />1.BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING
<br />
<br />LUMP SUM AND/OR UNIT PRICES.
<br />2.BIDS SHALL INCLUDE SALES TAX AND ALL OTHER APPLICABLE TAXES AND FEES.
<br />3.BIDDER IS TO INCLUDE FULL RESTORATION COSTS INTO THEIR UNIT PRICES EXCEPT FOR THE FINAL ASPHALT OVERLAY
<br />ITEM NODESCRIPTIONQUANTITYUNITUNIT COSTTOTAL
<br />OVEREXCAVATION, DISPOSAL, NEW FILL ITEMS
<br />THE PRICE FOR EACH SHALL INCLUDE BUT NOT BE LIMITED TO ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY TO INSTALL AND CONSTRUCT THESE ITEMS IN ACCORDANCE WITH THESE
<br />
<br />CONTRACT DOCUMENTS TO COVER OVEREXCAVATION WITH DISPOSAL OF UNSUITABLE MATERIAL WITH THE ADDITION OF NEW FILL.
<br />Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 4" Pipe20LF
<br />98
<br />Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 6" Pipe700LF
<br />99
<br />100Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 8" Pipe3800LF
<br />Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 12" Pipe10LF
<br />101
<br />OVEREXCAVATION, DISPOSAL, NEW FILL ITEMS SUB-TOAL (98 - 101)
<br />$
<br />WATERMAIN ITEMS
<br />WITH THE EXCEPTION OF THE FINAL ASPHALT OVERLAY, THE PRICE FOR EACH CONSTRUCTION ITEM SHALL INCLUDE BUT NOT BE LIMITED TO ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY TO INSTALL
<br />
<br />AND CONSTRUCT THESE ITEMS IN ACCORDANCE WITH THESE CONTRACT DOCUMENTS WHICH INCLUDE ALL SAW CUTTING, ASPHALT REMOVAL AND DISPOSAL, EXCAVATION, DE-WATERING WHERE
<br />POSSIBLE, DE-WATERING, EXCAVATION TRENCH AND EXISTING UTILITY SHEETING, SHORING, BRACING, SUPPORT & STABILIZATION & NPDES PERMITS, INCLUDING THE REQUIRED CONSTRUCTION BEST
<br />MANAGEMENT PRACTICES TO MAINTAIN TURBIDITY WITHIN THE REQUIRED NPDES STANDARDS DURING THE DURATION OF THE PROJECT, BEDDING MATERIAL, BACKFILL BASE MATERIAL, SODDING, CURBING,
<br />SIDEWALK, BACKFILL, LIMEROCK BASE MATERIAL, COMPACTION, MATERIAL TO BE RESTORED TO SAME ELEVATION AS ADJACENT GRADE, TESTING, INSPECTIONS, AND ANY OTHER MISCELLANEOUS WORK.
<br />BID PRICE SHALL INCLUDE SALTWATER INTRUSSION AND CORROSIVE SOIL PROTECTION, PROTECTION FROM HYDROCARBON CONTAMINATION, COMPLIANCE WITH GEOTECHNICAL RECOMENDATIONS, JOINT
<br />RESTRAINTS, ANY AND ALL TYPES OF BENDS AND FITTINGS REQUIRED FOR SUCESSFULL INSTALLATION, UTILITY/OWNER COORDINATION, 1" OF TEMPORARY SACRIFICAL ASPHALT TO BE MILLED AS PART OF ITEM
<br />
<br />13.
<br />WATER SERVICE CONNECTION (4" DIP) (PER FIG 216)44EA
<br />102
<br />103FIRE SERVICE CONNECTION (6" DIP) (PER FIG 216) (NOT SHOWN ON PLANS)44EA
<br />8" STEEL PIPE (INCLUDES ALL BENDS, FITTINGS, STRAPS, AND ANY OTHER EQUIPMENT OR MATERIAL)350LF
<br />104
<br />4" DIP (INCLUDES ALL BENDS AND FITTINGS)20LF
<br />105
<br />6" DIP (INCLUDES ALL BENDS AND FITTINGS)700LF
<br />106
<br />8" DIP (INCLUDES ALL BENDS AND FITTINGS)11400LF
<br />107
<br />12" DIP (INCLUDES ALL BENDS AND FITTINGS)10EA
<br />108
<br />AIR RELEASE VALVE 5EA
<br />109
<br />6" GATE VALVE30EA
<br />110
<br />1118" GATE VALVE17EA
<br />FIRE HYDRANT ASSEMBLY (PER FIG 307)30EA
<br />112
<br />CUT-IN CONNECTION TO EXISTING WATERMAIN3EA
<br />113
<br />REMOVAL OF EXISTING HYDRANTS30EA
<br />114
<br />REMOVAL OF EXISTING ASBESTOS CEMENT PIPE810LF
<br />115
<br />CAP AND GROUT FILL WATERMAINS ABANDONDED WATERMAINS 6" AND LARGER80BCY
<br />116
<br />8" REINFORCE SLAB (PER FIG 209) FOR USE WITH WATERMAINS WITH LESS THAN 2.5' COVER2400SQF
<br />117
<br />GEOTEXTILE FABRIC (TENSAR TX5)15000SY
<br />118
<br />1196" LINE STOP12EA
<br />8" LINE STOP12EA
<br />120
<br />12" LINE STOP12EA
<br />121
<br />SAMPLE POINTS20EA
<br />122
<br />WATERMAIN ITEMS SUB-TOAL (102 - 122)
<br />$
<br />MISCELLANEOUS ITEMS
<br />THE PRICE FOR EACH CONSTRUCTION ITEM SHALL INCLUDE BUT NOT BE LIMITED TO ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY TO INSTALL AND CONSTRUCT THESE ITEMS IN ACCORDANCE
<br />
<br />WITH THESE CONTRACT DOCUMENTS WHICH INCLUDE ALL SAW CUTTING, ASPHALT REMOVAL AND DISPOSAL, EXCAVATION, DE-WATERING, DE-WATERING & NPDES PERMITS, BEDDING MATERIAL,
<br />
<br />BACKFILL BASE MATERIAL, BACKFILL LIMEROCK BASE MATERIAL, COMPACTION, MATERIAL TO BE RESTORED TO SAME ELEVATION AS EXISTING ASPHALT PAVEMENT (GRADE TO SLOPE) GRADING, TESTING,
<br />
<br />INSPECTIONS AND ANY OTHER MISCELLANEOUS WORK. NO ADDITIONAL COMPENSATION SHALL BE MADE FOR CHANGES IN ALIGNMENT OR GRADE TO AVOID EXISTING INFRASTRUCTURE UNLESS THE
<br />
<br />EXCAVATIONS EXCEED TEN (10) FEET IN DEPTH.
<br />TREE REMOVAL AND REPLACEMENT (INCLUDES COORDINATION AND PERMITTING WITH MD-RER AND ANY
<br />12350EA
<br />PROFESSIONAL SERVICE, COMPLIANCE WITH ENDANGARED SPECIES ACT AND INSTALLATION OF ROOT BARRIER)
<br />$
<br />MISCELLANEOUS ITEMS SUB-TOAL (123 - 123)
<br />WATERMAIN REPLACEMENT TOTAL
<br />$
<br />GRAND BID TOTAL (ITEMS 1 - 123)
<br />
<br />
|