Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />8. WARRANTY OF SERVICES. <br />It is intended by the Parties that the City obtain the most expansive warranty services available <br />in the Contract Documents. Unless otherwise provided in Attachments "A" and `B," the <br />Contractor's Warranty of Services shall be as follows: <br />A. The Contractor shall warrant the labor performed for a minimum period of one (1) <br />year from the date the Services are complete. This warranty shall be in addition to <br />whatever rights the City may have under state or federal law. The Contractor's <br />obligation under this warranty shall be at its own cost and expense, to promptly <br />repair or replace (including cost of removal and installation), that item (or part or <br />component thereof) which proves defective or fails to comply with the Agreement <br />within the warranty period such that it complies with the Agreement. <br />B. Contractor warrants to the City that all materials and equipment furnished under <br />this Agreement will be new unless otherwise specified and will be of good <br />quality, free from faults and defects and in conformance with the Agreement. All <br />equipment and materials not conforming to these requirements, including <br />substitutions not properly approved and authorized, may be considered defective. <br />If required by City or its designee, Contractor shall furnish satisfactory evidence <br />as to the kind and quality of materials and equipment. This warranty is not limited <br />by any other provisions within this Agreement. <br />C. Contractor shall provide to the City or its designee all manufacturers' warranties. <br />All warranties expressed and/or implied, shall be given to the City for all material <br />and equipment covered by this Agreement. All material and equipment furnished <br />shall be fully guaranteed by the Contractor against factory defects and <br />workmanship. At no expense to the City, the Contractor shall correct any and all <br />apparent and latent defects that are required under state or federal law. <br />9. DEFECTIVE WORK. <br />A. The City or its designee shall have the authority to reject or disapprove work <br />which is found to be defective. If defective work is found, Contractor shall <br />promptly either correct all defective work or remove such defective work and <br />replace it with non -defective work. Contractor shall bear all direct and indirect <br />costs of such removal or corrections including cost of testing laboratories and <br />personnel. <br />B. Should Contractor fail or refuse to remove or correct any defective work or to make <br />any necessary repairs in accordance with the requirements of this Agreement <br />within the time indicated in writing by the City Manager or its designee, the City <br />shall have the authority to cause the defective work to be removed or corrected, or <br />make such repairs as may be necessary at Contractor's expense. Any expense <br />incurred by the City in making such removals, corrections or repairs, shall be paid <br />for out of any monies due or which may become due to Contractor. In the event of <br />BCREMIN HOLDINGS, LLC D/B/A FOREVER LAWN NORTH MIAMI 6 <br />