My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3635
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3635
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2024 11:31:32 AM
Creation date
3/28/2024 12:36:59 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3635
Date (mm/dd/yyyy)
03/21/2024
Description
2nd Amendment to Project Agreement w/ Keith & Associates, Inc., d/b/a Keith, for Landscape Architectural Svcs at Bella Vista Park.
Supplemental fields
Comment
Termination: Until Completion
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 5, 2024 / Page 3 of 13 <br />Bella Vista Park / Project #11723.04 <br />City of Sunny Isles Beach <br />Contract Addendum #2 <br />proprietary authorization for the existing dock, proposed second access walkway, and two proposed boat <br />lifts. Cummins Cederberg will coordinate with FDEP, the City, and surveyor as required by FDEP. <br />Task 611 Continued DERM Permitting <br />Cummins Cederberg will coordinate with Miami -Dade County Division of Environmental Resource <br />Management (DERM) to request authorization for the proposed project and after the fact authorization for <br />the riprap placed by the City along the shoreline. The City is proposing a change in the use of boat slips <br />from commercial, to municipal and transient vessel slips. Cummins Cederberg will maintain contact with <br />DERM staff to review plans and provide additional information as needed. <br />Task 612 USACE Permitting <br />Cummins Cederberg will prepare and process a Department of the Army Application with the USACE, <br />requesting verification of the General Permit 20 for the two proposed boat lifts on the existing finger piers. <br />Cummins Cederberg will maintain contact with the USACE to review plans and provide additional <br />information. <br />SCHEDULE <br />SURVEY SERVICES <br />Task 104 Sketch & Description — Sovereign Submerged Lands Lease 5 Weeks <br />LANDSCAPE ARCHITECTURE SERVICES <br />Task 704 Proposed Upland Deck Design Coordination (KEITH) Concurrent with Task 608 <br />MARINE ENGINEERING AND ENVIRONMENTAL CONSULTING SERVICES <br />(Cummins Cederberg — Structural and Environmental Sub.) <br />Task 606 <br />In -Season Marine Resource Survey <br />1 Month (In -Season) <br />Task 607 <br />Mitigation Negotiation for Mangrove Impacts <br />2 Months <br />Task 608 <br />Revised Permit Drawings <br />2 Months <br />Task 609 <br />FDEP SWERP Application <br />Follows Task 608, 2 Weeks <br />Task 610 <br />FDEP SWERP and SSL Lease Processing <br />12 Months <br />Task 611 <br />Continued DERM Permitting <br />12 Months <br />Task 612 <br />USACE Permitting <br />12 Months <br />Engineering Inspired Design. <br />
The URL can be used to link to this page
Your browser does not support the video tag.