My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3674
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2024 9:05:08 AM
Creation date
7/31/2024 3:49:24 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3674
Date (mm/dd/yyyy)
06/20/2024
Description
Approving Agreement w/ Nunez Construction for installation of an ER Generator and Building Restorations at Gateway Community Center.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
payment of those amounts due from the City have been received. Any payment not made <br />within twenty-five (25) days after the date due shall bear interest at the City's investment <br />earnings rate from the Florida State Board of Administration. <br />5.5 Substantial Completion <br />5.5.1. When the Contractor believes the Work is substantially complete, the <br />Contractor shall submit to the Engineer / Architect a list of items to be completed or <br />corrected; the Engineer / Architect or the City may supplement such list in the event the <br />Contractor has omitted any incomplete or defective work. When the Engineer / Architect, <br />on the basis of an inspection, and after consultation with the City, determines the Work is <br />in fact substantially complete, it will prepare a Certificate of Substantial Completion which <br />shall establish the date of Substantial Completion, shall state the responsibilities of the City <br />and the Contractor for Project security, maintenance, heat, utilities, damage to the Work, <br />and insurance, and shall fix the time within which the Contractor shall complete the items <br />listed therein. Guarantees required by the Contract shall commence on the date of <br />Substantial Completion of the Work. The Certificate of Substantial Completion shall be <br />submitted to the City and the Contractor for their written acceptance of the responsibilities <br />assigned to them in such certificate. <br />5.5.2. If required training, manuals and equipment materials have not been <br />provided, the Owner will hold $5,000.00 plus 300% as stated in Section 5.5.1. <br />5.6 Completion and Final Payment <br />5.6.1. When all of the Work is finally complete and the Contractor is ready for a final <br />inspection, it shall notify the City and the Engineer / Architect thereof in writing. Thereupon, <br />the Engineer/ Architect will make final inspection of the Work and, if the Work is complete <br />in full accordance with this Contract and this Contract has been fully performed, the <br />Engineer / Architect will promptly issue a final Certificate for Payment certifying to the City <br />that the Project is complete and the Contractor is entitled to the remainder of the unpaid <br />Contract Price, less any amount withheld pursuant to this Contract. If the Engineer / <br />Architect is unable to issue its final Certificate for Payment and is required to repeat its final <br />inspection of the Work, the Contractor shall bear the cost of such repeat final inspection(s) <br />which cost may be deducted by the City from the Contractor's final payment. <br />5.6.1.1. If the Contractor fails to achieve Final Completion within the time set forth in <br />Paragraph 3.1.1 hereinabove, the Contractor shall pay the City the sum the amount of <br />liquidated damages set forth in paragraph 3.1.2 per day for each and every calendar day of <br />unexcused delay in achieving final completion beyond the date set forth herein for final <br />completion of the Work. Any sums due and payable hereunder by the Contractor shall be <br />payable, not as a penalty, but as liquidated damages representing an estimate of delay <br />damages likely to be sustained by the City, estimated at or before the time of executing this <br />Contract. When the City reasonably believes that final completion will be inexcusably <br />Page 11 of 43 <br />279 <br />
The URL can be used to link to this page
Your browser does not support the video tag.