My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3674
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2024 9:05:08 AM
Creation date
7/31/2024 3:49:24 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3674
Date (mm/dd/yyyy)
06/20/2024
Description
Approving Agreement w/ Nunez Construction for installation of an ER Generator and Building Restorations at Gateway Community Center.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.7 Contractor Responsible for Delays <br />6.7.1. The Contractor shall be responsible for any damages caused to the City as a <br />result of any delays caused by the Contractor. <br />6.8 City's Right to Occupy <br />6.8.1. The City reserves the right to occupy any part of the Project when same is <br />Substantially Complete. It is expressly agreed, however, that partial occupancy of any part <br />of the Project does not activate any warranty obligations of the Contractor and any <br />warranties which contain time limitations shall commence on the date of Final Completion <br />unless otherwise expressly specified in the Contract Documents. <br />ARTICLE VII <br />THE CONTRACTOR <br />7.1. Upon providing no less than forty-eight (48) hours' notice to the Contractor, <br />the City may conduct a pre -construction conference at a time and place set forth in the <br />aforesaid notice. ATTENDANCE AT ALL PRE -CONSTRUCTION CONFERENCE(S) IS <br />MANDATORY AND FAILURE TO ATTEND SHALL BE A MATERIAL BREACH OF THIS CONTRACT. <br />7.2. The Contractor is again reminded of its continuing duty set forth in <br />Subparagraph 1.5.7. The Contractor shall perform no part of the Work at any time without <br />adequate Contract Documents or, as appropriate, approved Shop Drawings, Product Data <br />or Samples for such portion of the Work. If the Contractor performs any of the Work <br />knowing it involves a recognized error, inconsistency, or omission in the Contract <br />Documents without such notice to the Engineer / Architect the Contractor shall bear <br />responsibility for such performance and shall bear the cost of correction. <br />7.3. The Contractor shall perform the Work strictly in accordance with this <br />Contract. The Contractor shall also be responsible for all cutting, fitting or patching that may <br />be required to complete the Work or to make its several parts fit together properly. <br />7.4 Contractor's Professional Standard <br />7.4.1. City's engagement of the Contractor is based upon the Contractor's <br />representations to the City that: <br />Page 15 of 43 <br />283 <br />
The URL can be used to link to this page
Your browser does not support the video tag.