My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3674
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2024 9:05:08 AM
Creation date
7/31/2024 3:49:24 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3674
Date (mm/dd/yyyy)
06/20/2024
Description
Approving Agreement w/ Nunez Construction for installation of an ER Generator and Building Restorations at Gateway Community Center.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.2 Engineer / Architect's Administration <br />8.2.1. The Engineer / Architect, unless otherwise directed by the City in writing, will <br />perform those duties and discharge those responsibilities allocated to the Engineer / <br />Architect as set forth in this Contract. The Engineer / Architect shall be the City's <br />representative from the effective date of this Contract until final payment has been made. <br />The Engineer / Architect shall be authorized to act on behalf of the City only to the extent <br />provided in this Contract. <br />8.2.2. The City and the Contractor shall communicate with each other in the first <br />instance through the Engineer / Architect. The Contractor and the Engineer / Architect, <br />however, shall copy the City's designated representative with any and all written <br />communications by and between the parties. The City's designated representative for the <br />receipt of any such communications, or copies of same, is Richard Labinsky, Project <br />Manager, whose address is City of Sunny Isles Beach, 18070 Collins Avenue, Sunny Isles <br />Beach FL 33160. The City reserves the right to change its designated representative upon <br />written notice to the Contractor and Engineer / Architect. <br />8.2.3. The Engineer / Architect shall be the initial interpreter of the requirements of <br />the drawings and specifications and the judge of the performance there under by the <br />Contractor. The Engineer / Architect shall render written or graphic interpretations <br />necessary for the proper execution or progress of the Work with reasonable promptness on <br />request of the Contractor. <br />8.2.4. The Engineer / Architect will review the Contractor's Invoice and will certify <br />to the City for payment to the Contractor, those amounts then due the Contractor as <br />provided in this Contract. <br />8.2.5. The Engineer / Architect shall have authority to reject Work which is defective <br />or does not conform to the requirements of this Contract. If the Engineer / Architect deems <br />it necessary or advisable, the Engineer / Architect shall have authority to require additional <br />inspection or testing of the Work for compliance with Contract requirements. <br />8.2.6. The Engineer / Architect will review and approve, or take other appropriate <br />action as necessary, concerning the Contractor's submittals including Shop Drawings, <br />Product Data and Samples. Such review, approval or other action shall be for the sole <br />purpose of determining conformance with the design concept and information given <br />through the Contract Documents. <br />8.2.7. The Engineer / Architect will prepare Change Orders and may authorize minor <br />changes in the Work upon approval from the City by Field Order as provided elsewhere <br />herein. <br />Page 22 of 43 <br />290 <br />
The URL can be used to link to this page
Your browser does not support the video tag.