My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEGO CONSTRUCTION
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-07-01) Construction of Intracoastal Sports Park
>
LEGO CONSTRUCTION CO
>
LEGO CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 11:27:33 AM
Creation date
9/11/2024 11:24:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 <br />ITB 24-07-01 INTRACOASTAL SPORTS PARK <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />6. Has your company ever been debarred or terminated for default on a government contract? <br />7. Identify your debris disposal plan. <br />8.Bidder must list any exceptions taken to the terms and condition in this ITB. <br />9. Discuss what strategies the submitter will utilize to keep this project on schedule, considering <br />long lead-times on fabrication. <br />10. Discuss strategies the submitter will implement to ensure the project is kept on budget. <br />LEGO Construction Co. has never been debarred or terminated for default on any government contract. <br />LEGO CC confirms there are no exeptions to the specified terms and conditions and fully accept <br /> them as presented. <br />LEGO Construction Co. ensures on-time project delivery through a combination of proactive planning, advanced procurement, and detailed scheduling. We will coordinate early with stakeholders to address long lead-timeson fabrication, prioritize the early procurement of critical materials, and maintain a detailed project schedule totrack progress. Our approach includes regular communication with all parties and expedited approvals toprevent delays. <br />With a proven track record of delivering 100% of our completed projects on time and on budget,LEGO Construction Co. is committed to meeting the project schedule, even in the face of challenges. <br />More information about adherance to schedule can be found in the attached proposal, section 4 Approach and Method. <br />LEGO Construction Co. will implement a comprehensive debris disposal plan that prioritizes <br />efficiency, safety, and environmental responsibility. All debris will be sorted on-site for recycling <br />and disposal, with materials like concrete, metal, and wood sent to appropriate recycling facilities. <br />Non-recyclable waste will be transported to a licensed landfill, following all local regulations <br />and environmental guidelines. Regular site clean-ups and debris removal will ensure the project area remains safe and organized, minimizing disruption to the surrounding community. <br />LEGO Construction Co. ensures projects stay on budget through:Thorough Pre-Construction Planning: Accurate cost estimates and budget setting.Value Engineering: Cost-effective solutions without sacrificing quality.Continuous Monitoring: Real-time expense tracking and regular budget reviews.Efficient Procurement: Competitive pricing from trusted suppliers and subcontractors.Change Order Management: Strict procedures to handle scope changes and their budget impacts.Contingency Planning: Allocated budget for unforeseen costs.With 100% of our projects delivered on budget, LEGO Construction Co. is dedicated to financial discipline throughout. <br />More information about adherance to schedule can be found in the attached proposal, section 4 Approach and Method.
The URL can be used to link to this page
Your browser does not support the video tag.