My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MBR CONSTRUCTION
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-07-01) Construction of Intracoastal Sports Park
>
MBR CONSTRUCTION
>
MBR CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 11:31:21 AM
Creation date
9/11/2024 11:29:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXPERIENCE ON SIMILAR PROJECTS <br />DESIGN BUILD SERVICES FOR CAPORELLA PARK – (2023) <br /> <br />The scope of work included increasing the parking lot capacity by adding four more parking <br />spaces and an additional handicapped space. A new entry plaza to welcome visitors, and a <br />1,200 square feet Restroom & Concessions Building. <br />In addition to these improvements, a 1/3 of a mile long concrete 8’ wide multipurpose trail <br />was developed, leading to all the park amenities. These amenities comprise a dedicated area <br />with 10 fitness stations, complete with shade for users. A 5,000 square feet playground <br />featuring universal-access equipment and a shade structure which provides a safe and <br />enjoyable space for children. <br />A 40x40 Picnic Shelter was constructed, equipped with picnic tables and BBQ grilles for park <br />visitors to enjoy outdoor meals. The project also included the installation of a stage and <br />amphitheater, featuring a 2,500 square feet tensile structure stage along the edge of the <br />lake. A grass amphitheater/plaza area for spectators overlooking the expansive lake, serving <br />as a picturesque backdrop for events. <br />Furthermore, enhancements to recreational features included a fishing pier, accessible from <br />the new multipurpose walking trail. The pier has added lighting for better visibility. <br />Additionally, a new non-motorized boat launch with a floating deck was established, <br />providing ADA direct access from the primary parking lot. <br />Original Contract Amount: $ 4,438,830.94 Final Contract Amount: $ 4,808,318.35 <br />Client: City of Tamarac Contact: Dibb Machuca, Project Manager <br />Telephone: 954-597-3725 Email: Dibb.Machuca@tamarac.org
The URL can be used to link to this page
Your browser does not support the video tag.