My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Small Construction Projects - Final
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(14-10-02) Small Construction Projects
>
Small Construction Projects - Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2014 10:01:16 AM
Creation date
10/30/2014 10:00:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach |Invitation to Bid No. 14-10-02 19 <br /> <br />INFRASTRUCTURE REPAIRS BID FORM <br /> <br />ITEM <br />NO DESCRIPTION QTY UNIT <br />PRICE($) <br />EXTENDED <br />PRICE ($) <br /> <br />I. Group I - MOT, Erosion Control and Earthwork <br /> A. Non-Emergency (Max. response time 3 Business Days) <br />1. Temporary Barricades – Type I or Type II 1 EA <br />2. Sediment Barrier 1 LF <br />3. Floating Turbidity Barrier 1 LF <br />4. Inlet Protection System 1 EA <br />5. Silt Fence 1 LF <br />6. Temporary Construction Fence – includes chain <br />link fence and green screen 1 LF <br />7. Clearing & Grubbing 1 LS/AC <br />8. Sawcut, grind and remove existing concrete <br />pavement 1 SY <br />9. <br />Milling Existing Asphalt Pavement – consists of <br />removing existing AC pavement. Includes <br />transportation of milled material and removal of <br />existing reflective pavement markers. <br /> <br /> <br /> a. 1” Av Depth 1 SY <br /> b. 2” Av Depth 1 SY <br /> c. 3” Av Depth 1 SY <br />10. Removal of existing Architectural pavers 1 SY <br />11. <br />Regular Excavation – consists of excavation, <br />hauling and disposal of rock, clay, muck of other <br />unsuitable material <br />1 CY <br /> <br /> B. Emergency (Max. response time 4 Hrs.) <br />12. Temporary Barricades – Type I or Type II 1 EA <br />13. Sediment Barrier 1 LF <br />14. Floating Turbidity Barrier 1 LF <br />15. Inlet Protection System 1 EA <br />16. Silt Fence 1 LF
The URL can be used to link to this page
Your browser does not support the video tag.