My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Small Construction Projects - Final
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(14-10-02) Small Construction Projects
>
Small Construction Projects - Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2014 10:01:16 AM
Creation date
10/30/2014 10:00:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach |Invitation to Bid No. 14-10-02 27 <br /> <br />ITEM <br />NO DESCRIPTION QTY UNIT <br />PRICE($) <br />EXTENDED <br />PRICE ($) <br /> i. 24” diameter RCP 8 LF <br /> j. 30” diameter RCP 8 LF <br /> k. 36” diameter RCP 8 LF <br /> l. 6” diameter HDPE /PVC 20 LF <br /> m. 8” diameter HDPE / PVC 20 LF <br /> n. 10” diameter HDPE / PVC 20 LF <br /> o. 12” diameter HDPE / PVC 20 LF <br /> p. 16” diameter HDPE / PVC 20 LF <br /> q. 18” diameter HDPE / PVC 20 LF <br /> r. 24” diameter HDPE / PVC 20 LF <br /> s. 30” diameter HDPE / PVC 20 LF <br /> t. 36” diameter HDPE/PVC 20 LF <br />68. <br />Pipe filling and plugging (when pipe to be placed <br />out of service). This may also apply to the filling <br />and plugging of existing drainage structures <br />when it is not practical to remove them. <br />1 CY <br /> <br />69. Pipe Liner – Furnish and Install optional material <br /> a. 0-24” diameter 1 LF <br /> b. 25-36” diameter 1 LF <br /> c. 37-48” diameter 1 LF <br />70. Yard Drain – furnish and install 1 EA <br />71. <br />Adjust existing inlet/manhole – consists of <br />modifying the vertical placement of the structure <br />to conform with existing finished grade <br />elevations. <br />1 EA <br /> <br />72. <br />French Drain / Exfiltration Trench – includes <br />furnishing and placing the pipe, pipe plugs, pipe <br />fittings, course aggregate and filter fabric, as <br />well as trenching, backfilling, sheeting and when <br />necessary. <br />1 LF <br /> <br /> a. 18” 1 LF <br /> b. 24” 1 LF
The URL can be used to link to this page
Your browser does not support the video tag.