REFRIGERANT PIPING NOTES1. REFRIGERANT PIPING SHALL BE COPPER, REFRIGERATION GRADE, SOFT TEMPER,SEALED AT THE MILL. CIRCULATE DRY NITROGEN THROUGH PIPING WHENSOLDERING. TEST FOR LEAKS PRIOR TO CHARGING SYSTEM WITH R-410AREFRIGERANT.2. THE CONTRACTOR SHALL CONFIRM THE DIAMETER OF THE REFRIGERANT PIPING RUNSIN EXCESS OF 50 EQUIVALENT FEET WITH MANUFACTURER FOR ALL SPLIT SYSTEMS.3. "ARMAFLEX" OR EQUAL INSULATION SHALL BE USED FOR SUCTION AND HOT GAS REHEATREFRIGERANT LINES (3/4" THICKNESS OR PER MANUFACTURERS SPECIFICATIONS). ALLDUCTLESS AND VARIABLE REFRIGERANT FLOW UNITS SHALL HAVE LIQUID AND SUCTIONLINES INSULATED. FILTER/DRYER AND SIGHT GLASS SHALL BE PROVIDED AT LIQUIDLINES. ALL OUTDOOR PIPING INSULATION EXPOSED TO SUNLIGHT AND WEATHER SHALLBE PAINTED WITH TWO COATS OF PROTECTIVE (K-FLEX 374 OR APPROVED EQUAL).4. REFRIGERANT CIRCUIT ACCESS PORTS LOCATED OUTDOORS SHALL BE FITTED WITHLOCKING-TYPE TAMPER-RESISTANT CAPS OR SHALL BE OTHERWISE SECURED TOPREVENT UNAUTHORIZED ACCESS AS PER FMC-2023, SEC. 1101.10.5. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL FULLY PRESSURE CHECKAND CHARGE ALL REFRIGERANT SYSTEMS (IF REQUIRED).6. CONTRACTOR SHALL SUBMIT A REFRIGERANT PIPE LAYOUT WITH SIZES FOR ALLVARIABLE REFRIGERANT FLOW SYSTEMS TO ENGINEER FOR APPROVAL PRIOR TOORDERING AND INSTALLATION.GENERAL HVAC NOTES19.CONTRACTOR SHALL INSTALL SMOKE DETECTORS WITH SERVICE ACCESS DOORS ON THE SUPPLYSIDE OF AIR SYSTEMS WITH A DESIGN CAPACITY GREATER THAN 2,000 CFM, THE DETECTOR SHALLBE LOCATED DOWNSTREAM OF THE AIR FILTERS AND AHEAD OF ANY BRANCH CONNECTIONS ASPER FMC-2023, SEC. 606.2.1. CONTRACTOR SHALL INSTALL SMOKE DETECTORS WHERE MULTIPLEAIR-HANDLING SYSTEMS SHARE A COMMON SUPPLY WITH A COMBINED DESIGN CAPACITYGREATER THAN 2,000 CFM AS PER FMC-2023, SEC. 606.2.2 . FOR SMOKE DETECTORS NOT VISIBLE,IN CONCEALED SPACES, PROVIDE REMOTE ANNUNCIATION/TEST STATION AS REQUIRED BYAUTHORITY HAVING JURISDICTION, COORDINATE PRIOR TO INSTALLATION. DETECTORS SHALL BEBY ONE MANUFACTURER, COORDINATE VOLTAGE ETC. WITH ELECTRICAL CONTRACTOR AND FIREALARM SYSTEM BEFORE ORDERING. UPON DETECTION, SMOKE DETECTORS SHUT DOWNASSOCIATED AIR MOVING EQUIPMENT AND ALL AIR MOVING EQUIPMENT SERVING THAT COMMONPLENUM.20.ALL INSTALLED ELECTRICAL DEVICES, ACTUATORS, APPURTENANCES, AUXILIARY EQUIPMENT, ETC.REQUIRING ENVIRONMENTAL PROTECTION SHALL BE PROVIDED WITH ADEQUATE NEMAENCLOSURES FOR THE CONDITIONS WHERE INSTALLED, WEATHER INDOORS OR OUTDOORS, EVENIF NOT SPECIFICALLY INDICATED ON PLANS.21.A LISTED SMOKE-DAMPER DESIGNED TO RESIST THE PASSAGE OF SMOKE SHALL BE PROVIDED ATEACH PENETRATION OF A SMOKE BARRIER IN COMPLIANCE WITH FMC-2023, SEC. 607.5.4 ANDCONTROLLED AS REQUIRED BY SEC. 607.5.4.1 . PROVIDE SERVICE ACCESS AS REQUIRED.22.MECHANICAL EQUIPMENT ON ROOF OR ELEVATED STRUCTURES SHALL COMPLY WITH FMC-2023SEC. 306.5 IF INSTALLED HIGHER THAN 16 FEET A.F.F. ALL ROOF CURBS SHALL BE A MIN. OF 8"ABOVE FINISHED ROOFING SURFACE UNLESS OTHERWISE SPECIFIED ON DRAWINGS. MECHANICALEQUIPMENT INSTALLED IN ATTICS SHALL MEET THE REQUIREMENTS OF FMC-2023 SEC. 306.3 IF THEEQUIPMENT CAN NOT BE SERVICED/REMOVED THROUGH REQUIRED OPENING. MECHANICALEQUIPMENT SHALL BE PROTECTED WITH MECHANICAL BARRIERS IF EXPOSED TO MECHANICALDAMAGE. ALL EXTERIOR GRADE MOUNTED EQUIPMENT SHALL BE INSTALLED ON 6" CONCRETE PAD.23.ALL WIND LOAD AND OTHER COMPLIANCE CALCULATIONS AND/OR INSTALLATION DETAILS FORROOF MOUNTED EQUIPMENT AS REQUIRED BY FBC-2023, SEC. 1510, 1522 AND CHAPTER 16, SHALLBE PROVIDED BY STRUCTURAL ENGINEER/ARCHITECT. CONTRACTOR TO PROVIDE WIND LOADCALCULATIONS SIGNED AND SEALED BY A FLORIDA REGISTERED ENGINEER FOR NONPRE-APPROVED CONFIGURATIONS DEVIATING FROM THE ORIGINAL CONSTRUCTION DOCUMENTS.24.CLEARANCE FOR MAINTENANCE, SERVICE, REPAIRS, AND REPLACEMENT FOR ALL MECHANICALEQUIPMENT SHALL BE PROVIDED TO COMPLY WITH FMC-2023, SEC. 306. SERVICE ACCESS PANELSFOR MECHANICAL EQUIPMENT IN CONCEALED SPACES SHALL BE PROVIDED TO COMPLY WITH THEREQUIREMENTS OF SEC. 306.25.CONTRACTOR SHALL PROVIDE A CERTIFIED TEST & BALANCE REPORT AT COMPLETION OFPROJECT PRIOR TO FINAL INSPECTION. IT SHALL BE DONE BY AN INDEPENDENT COMPANY FOR ALLMECHANICAL EQUIPMENT, AIR AND WATER DEVICES, DAMPERS, AND ANY AIR MOVING SYSTEMS.THE TEST AND BALANCE REPORT SHALL BE IN ACCORDANCE WITH THE AABC OR NEBB STANDARDSAND PROCEDURES AND SHALL INCLUDE AIR QUANTITIES FOR ALL SUPPLY GRILLES, RETURNGRILLES AND EXHAUST GRILLES AND THE LEAVING AND ENTERING AIR TEMPERATURE (°F) FROMSUPPLY GRILLES, EVAPORATORS, ENERGY RECOVERY UNITS AND ANY TYPE OF HEATEXCHANGERS. FOR (EXISTING) SMOKE EVACUATION SYSTEMS HVAC CONTRACTOR SHALL PROVIDEA T & B REPORT PRIOR TO ANY NEW WORK, PROVING THAT THE SMOKE EVACUATION SYSTEMPERFORMS PER ORIGINAL DESIGN DOCUMENTS AND IS COMPLIANT WITH LOCAL CODEREQUIREMENTS. CONTRACTOR SHALL INCLUDE COSTS NECESSARY (PART OF BID) TO MAKE ONECHANGE IN EACH UNITS SHEAVE, BUSHINGS AND BELTS, BALANCING DAMPERS REQUIRED AND ANYOTHER DEVICES REQUIRED FORTHE CORRECT BALANCE OF THE SYSTEM AS REQUIRED BY THETAB FIRM.26.O/A INTAKES SHALL NOT BE TAKEN FROM A LOCATION CLOSER THAN 10 FT FROM ANY CHIMNEY,VENT OUTLET OR SANITARY SEWER VENT OUTLET PER FMC-2023, SEC. 401.4. OUTSIDE AIR INTAKEVENTS LOCATED ON ROOFS WILL BE PROPERLY MARKED WITH A UNIVERSAL MARKING "INTAKE",PERMANENTLY ATTACHED.27.MECHANICAL EQUIPMENT, APPLIANCES AND SUPPORTS THAT ARE EXPOSED TO WIND SHALL BEDESIGNED AND INSTALLED TO RESIST THE WIND PRESSURES DETERMINED IN ACCORDANCE WITHTHE FLORIDA BUILDING CODE, BUILDING.28.GENERAL CONTRACTOR SHALL VERIFY THAT THE AIR CONDITIONED SPACE IS SEALED WITH ANAPPROVED AIR BARRIER IN ACCORDANCE WITH FECC-2023, SEC 402.5.1. MECHANICALCONTRACTOR SHALL NOTIFY GENERAL CONTRACTOR, ARCHITECT AND ENGINEER IN WRITING OFANY DISCREPANCIES PRIOR TO INSTALLATION OF ANY EQUIPMENT.29.FURNISH AND INSTALL PIPE IDENTIFICATION MARKERS ON ALL PIPES AND EQUIPMENT INSTALLEDUNDER THIS CONTRACT. MARKERS SHALL BE A MINIMUM OF 1-1/2" X 8" AND IDENTIFIED INACCORDANCE WITH THE BACKGROUND AND LETTER COLOR PIPING SHALL BE IDENTIFIED ASFOLLOWS: CHILLED WATER RETURN, CHILLED RS ISSUED BY THE AMERICAN NATIONALSTANDARDS INSTITUTE (ANSI). WATER SUPPLY, CONDENSATE, HOT WATER RETURN, HOT WATERSUPPLY, CONDENSER WATER RETURN, CONDENSER WATER SUPPLY, REFRIGERANT LIQUID,REFRIGERANT SUCTION, AND DIRECTIONAL ARROWS. ALL IDENTIFICATIONS MUST BE VISIBLE ATEQUIPMENT.1.ALL WORK SHALL COMPLY WITH THE 2023 EDITION OF THE FLORIDA MECHANICAL, ENERGYCONSERVATION, ACCESSIBILITY CODES, AND AND ALL LOCAL CODE AMENDMENTS.2.CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO BIDDING, ORDERING, FABRICATIONOR INSTALLATION OF MATERIALS OR EQUIPMENT, IN ORDER TO PROVIDE A FULLY INTEGRATEDMECHANICAL AND CONTROLS SYSTEMS WITH THE EXISTING ONES. ANY DISCREPANCY BETWEENEXISTING CONDITIONS AND PLANS, OR ADDITIONAL CLARIFICATION REQUIRED SHALL BE BROUGHTTO THE ATTENTION OF ENGINEER PRIOR TO FINAL BIDDING AND WORK. SUBMISSION OF THECONTRACTORS PROPOSAL SHALL BE CONSTRUED AS INDICATING SUCH KNOWLEDGE. ANYCHANGES RESULTING FROM CONFLICTS IN THE FIELD, WHICH WERE NOT BROUGHT TO THEENGINEERS ATTENTION, ARE TO BE MADE BY THIS CONTRACTOR AT NO ADDITIONAL COST TO THEOWNER.3.DO NOT SCALE DRAWINGS. VERIFY DIMENSIONS IN FIELD PRIOR TO COMMENCEMENT OF WORK.MECHANICAL PLANS ARE GENERAL, DIAGRAMMATIC IN NATURE, AND ARE TO BE READ INCONJUNCTION WITH ARCHITECTURAL, PLUMBING, ELECTRICAL, FIRE SPRINKLER, STRUCTURAL ANDINTERIOR DESIGNER PLANS AND SHALL BE CONSIDERED AS ONE SET OF DOCUMENTS. PROVIDEOFFSETS AND DEVIATIONS FROM WORK SHOWN ON THE DRAWINGS AS MAY BE NECESSARY TO FITACTUAL SPACE CONDITIONS AT NO ADDITIONAL COST TO THE OWNER. DUCTWORK CHANGES MAYBE MADE BY CONTRACTOR USING EQUIVALENT SIZED DUCT. CONTACT ENGINEER IF DUCT AREAWILL NOT FIT.4.CONTRACTOR SHALL PROVIDE A COMPLETE MECHANICAL SYSTEM(S) AS DETAILED ON THEDRAWINGS AND SPECIFICATIONS. WORK CONSISTS OF PROVIDING ALL MATERIALS, EQUIPMENT,APPURTENANCES, ETC. REQUIRED FOR A COMPLETE SYSTEM(S). INCLUDE ANY INCIDENTALAPPARATUS, APPLIANCES, MATERIALS, LABOR, PERMITS, SERVICES, ETC. NECESSARY TO MAKEWORK COMPLETE AND READY FOR OPERATION. IT IS THE INTENT OF THE DRAWINGS ANDSPECIFICATIONS TO CALL FOR COMPLETE, FINISHED WORK, TESTED, AND READY FOR OPERATION.5.CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING CONFLICTS IN THE DRAWINGS ANDSPECIFICATIONS PRIOR TO BIDDING AND REPORTING CONFLICTS TO THE ENGINEER BEFOREBIDDING. ANY CHANGES RESULTING FROM CONFLICTS IN THE FIELD, WHICH WERE NOT BROUGHTTO THE ENGINEERS ATTENTION, ARE TO BE MADE BY THE CONTRACTOR AT NO ADDITIONAL COSTTO THE OWNER.6.CONTRACTOR SHALL GUARANTEE THE INSTALLATION AGAINST DEFECTS IN MATERIALS ANDWORKMANSHIP WHICH MAY OCCUR UNDER NORMAL USAGE FOR A PERIOD OF ONE YEAR AFTEROWNER'S ACCEPTANCE. DEFECTS SHALL BE PROMPTLY REMEDIED WITHOUT COST TO THE OWNER.7.CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS, FEES, INSPECTION AND TESTS.CONTRACTOR SHALL OBTAIN PERMIT AND APPROVED SUBMITTALS PRIOR TO COMMENCEMENT OFWORK OR ORDERING EQUIPMENT. CONTRACTOR SHALL BE PRESENT FOR ALL INSPECTIONS OF HISWORK BY REGULATORY AUTHORITIES.8.CONTRACTOR SHALL PROVIDE RECORD DRAWINGS TO THE BUILDING OWNER AND ARCHITECT.DRAWINGS SHALL INCLUDE ALL ADDENDUM ITEMS, CHANGE ORDERS, ALTERATIONS, REROUTING,ETC.9.CONTRACTOR SHALL PROVIDE INSURANCE FOR PROTECTION AGAINST PUBLIC LIABILITY ANDPROPERTY DAMAGE FOR THE DURATION OF THE WORK.10.ALL MATERIAL SHALL BE NEW OF U.S. MANUFACTURER OF GOOD QUALITY. ALL WORK SHALL BEPERFORMED AT INDUSTRY STANDARD QUALITY LEVEL BY CERTIFIED PROFESSIONALS. ALLEQUIPMENT SHALL BE UL OR ETL LISTED. ALL INSTALLATIONS SHALL COMPLY WITH FMC 2023, CH. 3,GENERAL REGULATIONS . BUILDINGS LOCATED WITHIN 3,000 FT FROM THE OCEAN SHALL UTILIZENON-FERROUS MATERIALS FOR ALL OUTDOOR EXPOSED SUPPORTS, STANDS, FASTENERS, ETC.11.CONTRACTOR SHALL PROVIDE SHOP DRAWINGS FOR ALL MECHANICAL EQUIPMENT, CONTROLS ANDACCESSORIES COORDINATED WITH ALL TRADES AT ONE TIME, INDEXED IN A NEAT AND ORDERLYMANNER. PARTIAL SUBMITTALS WILL NOT BE ACCEPTED. CONTRACTOR SHALL NOT ORDER ANYEQUIPMENT WITHOUT APPROVAL FROM ENGINEER, ARCHITECT, OWNER, AND INTERIOR DESIGNER(IF APPLICABLE).12.COORDINATE EXACT LOCATION OF ALL DIFFUSERS AND RETURNS WITH ARCHITECTURALREFLECTED CEILING PLAN.13.CONTRACTOR SHALL PROVIDE ACCESS PANELS FOR ALL CONCEALED MECHANICAL EQUIPMENT.PANELS IN RATED WALLS OR CEILINGS MUST MAINTAIN THE SAME RATING AND MUST MATCH THEFINISH OF THE WALL OR CEILING IN WHICH IS INSTALLED.14.MATERIALS ALLOWED IN RETURN AIR PLENUMS OR ABOVE CEILINGS USED AS RETURN AIR PLENUMSHALL COMPLY WITH FMC-2023, SECTION 602.2.1. IF SPACE WITH RETURN AIR PLENUM HAS ANYDECK TO DECK PARTITIONS, AIR TRANSFER DUCTS MUST BE INSTALLED. WHEN CPVC PIPING ISUSED FOR FIRE SPRINKLER SYSTEMS, THE R/A GRILLES LAYOUT SHALL BE (FIELD) COORDINATEDWITH SUCH PIPING SO THAT NO PORTION OF THE GRILLES WILL BE DIRECTLY BELOW THE CPVCPIPING. STUD CAVITIES AND JOIST SPACE PLENUMS SHALL COMPLY WITH FMC-2023, SEC. 602.3.15.CONDENSATE DRAIN PIPING TO BE AS SPECIFIED PER PLUMBING PLANS. IF NOT SPECIFIED THEYSHALL BE TYPE "L" COPPER, CPVC OR SCHEDULE 40 PVC WHERE ALLOWED BY CODE. PROVIDE 3/4"THICK AP/ARMAFLEX SS (SELF-SEAL) INSULATION FOR ALL HORIZONTAL ABOVE-GRADE PIPING.PROVIDE APPROVED WATER LEVEL DETECTOR OR FLOAT SWITCH TO AUTOMATICALLY SHUT DOWNTHE AIR COND. UNIT, AS A SECONDARY DRAIN SYSTEM TO COMPLY WITH FMC-2023, SEC. 307.SUPPLY CONDENSATE PUMP WHERE NECESSARY AS IMPOSED BY FIELD CONDITIONS ORINSTALLATION CHANGES AND PIPE TO CONDENSATE DRAIN PER PLUMBING PLANS. PVC PIPINGEXPOSED TO SUNLIGHT SHALL BE COATED WITH AN ULTRA VIOLET INHIBITING MATERIAL.16.RUN INSULATED FIRE RATED CONDENSATE DRAINS AS REQUIRED. AUXILIARY DRAIN PANS SHALL BEINSTALLED UNDER ALL COILS ON WHICH CONDENSATION CAN OCCUR AND UNDER ALL UNITS INCONCEALED SPACES OR ANY AREA WHERE BLDG. DAMAGE CAN OCCUR AS A RESULT OF ANOVERFLOW, TO COMPLY WITH FMC-2023, SEC. 307.2 . AN ALTERNATE WATER-DETECTION LEVELDEVICE TO SHUT DOWN THE EQUIPMENT IS ACCEPTABLE.17.LOCATE THERMOSTATS, TEMPERATURE SENSORS, CONTROLLERS, C02 SENSORS, AND HUMIDITYSENSORS ABOVE FINISHED FLOOR AS PER 2023 FLORIDA ACCESSIBILITY CODE SECTION 5REQUIREMENT 5 . COORDINATE LOCATIONS WITH OTHER EQUIPMENT, FURNITURE, AND DOORSWINGS. MECHANICAL CONTRACTOR SHALL COORDINATE WITH ELECTRICAL CONTRACTOR ALLREQUIREMENTS FOR JUNCTION BOXES, CONDUITS, CONTROL WIRING, POWER, ETC. AND DEFINERESPONSIBILITIES AND SCOPE OF WORK FOR EACH TRADE PRIOR TO PURCHASING/INSTALLATION.18.PROVIDE NEW FILTERS FOR ALL AIR CONDITIONING EQUIPMENT BEFORE START-UP, REPLACE PRIORTO FINAL ACCEPTANCE BY OWNER.••••••••••••••••FLORIDA BUILDING CODE 8TH EDITION (2023)FLORIDA BUILDING CODE MECHANICAL 8TH EDITION (2023)FLORIDA ENERGY CONSERVATION CODE 8TH EDITION (2023)FLORIDA FIRE PREVENTION CODE 8TH EDITION (2023)ASHRAE 2020 FUNDAMENTALS HANDBOOKNFPA 90A - STANDARD FOR AIR CONDITIONING AND VENTILATION SYSTEMSNFPA 101 - LIFE SAFETY CODESMACNA 2020 HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLEUL181 2005 FACTORY MADE AIR DUCTS AND AIR CONNECTORSINSIDE DESIGN CONDITIONS - 75/63°F COOLING, 72°F HEATINGOUTSIDE DESIGN CONDITIONS - 92/78°FEXTERIOR CBS WALL INSULATION - FI-FOIL R5.0ROOF INSULATION - R22.0 AVERAGESLAB ON GRADE INSULATION - NONEELEVATED FLOOR OVER UNCONDITIONED SPACE - NONEEXTERIOR GLAZED FENESTRATION SUMMER DAYTIME U VALUE = 1.07, SHGC=0.651.THESE ENGINEERING DOCUMENTS AND THE RESULTING INSTALLATION OF THE DEPICTED HVACSYSTEMS FOR THIS PROJECT ARE INTENDED TO CONFORM TO THE FOLLOWING CODES ANDSTANDARDS:IF WORK AS LAID OUT, INDICATED OR SPECIFIED IS CONTRARY TO OR CONFLICTS WITH THELISTED CODES AND STANDARDS, THE CONTRACTOR SHALL REPORT IN WRITING TO THEARCHITECT/ENGINEER BEFORE SUBMITTING A BID. THE ARCHITECT/ENGINEER WILL THENISSUE INSTRUCTIONS AS HOW TO PROCEED.2.ALL EQUIPMENT SHALL BE INSTALLED PER THE MANUFACTURER'S INSTRUCTIONS,SPECIFICATIONS, AND RECOMMENDATIONS FOR SAFE AND EFFICIENT OPERATIONS.ALL MANUFACTURER OPERATION AND MAINTENANCE GUIDES SHALL BE ISSUED TO THEBUILDING OPERATOR AFTER SUCCESSFUL COMPLETION OF MAINTENANCE AND/ORPREVENTATIVE MAINTENANCE PROCEDURES TRAINING OF THE BUILDING OPERATORS.4.DESIGN CRITERIA INCLUDES BUT NOT LIMITED TO:TO THE BEST OF HAMMOND & ASSOCIATES, INC. KNOWLEDGE, THE PLANS AND SPECIFICATIONSPROVIDED FOR THIS PROJECT COMPLY WITH THE APPLICABLE MINIMUM BUILDING CODES ANDTHE APPLICABLE FIRE SAFETY STANDARDS AS DETERMINED BY THE LOCAL AUTHORITY INACCORDANCE WITH SECTION FBC 110.4.4 OF FLORIDA BUILDING CODE 2023 8TH EDITION ANDCHAPTER 633, FLORIDA STATUS.3.MECHANICAL CONTRACTOR SHALL COMPLY WITH ALL M.D.C.P.S. SPECIFICATIONS AND CRITERIABOOK SPECIFICATION NOTES1. THESE DOCUMENTS HAVE BEEN CREATED IN CONJUNCTION WITH BOOKSPECIFICATIONS. CONTRACTOR SHALL CONSIDER THE PLANS AND BOOKSPECIFICATIONS AS ONE COMPLETE SET.2. CONTRACTOR SHALL NOTIFY THE ARCHITECT/ENGINEER OF ANY DISCREPANCIESBETWEEN THE PLANS AND THE BOOK SPECIFICATIONS AND ALLOW TIME FOR ARESPONSE. FOR ANY DISCREPANCY THE MORE STRINGENT SHALL BE FOLLOWED.3. A COMPLETE COPY OF THE BOOK SPECIFICATIONS SHALL BE ON THE SITE WITHTHE PLANS AT ALL TIMES AND AVAILABLE FOROWNER/ARCHITECT/ENGINEER.INSPECTOR REFERRAL.4. THE BOOK SPECIFICATIONS THAT ARE PROVIDED WITH THESE PLANS CONTAINDESIGN INFORMATION AND REQUIREMENTS TO COMPLETE THE PROJECT. THESPECIFICATIONS SHALL BE READ AND FOLLOWED BEFORE AND DURINGCONSTRUCTION.5. IF THE CONTRACTOR FAILS TO FAMILIARIZE HIMSELF WITH THE BOOKSPECIFICATIONS AND/OR FOLLOW THE INFORMATION IN THEM THEN THE SUBCONTRACTOR AND GENERAL CONTRACTOR AND THEIR RELATED SUBCONTRACTORSSHALL BE HELD SOLELY RESPONSIBLE FOR ALL ITEMS MISSING INCONSTRUCTION, ETC.6. PRIOR TO SENDING COMMUNICATIONS TO THE ARCHITECT/ENGINEER OF RECORDTHROUGH THE PROPER COMMUNICATION CHANNELS THE SUBCONTRACTOR ANDGENERAL CONTRACTOR SHALL REVIEW THE BOOK SPECIFICATIONS FOR ANYQUESTIONS REGARDING DESIGN OR MATERIALS.BUILDING ENVELOPEGENERAL DUCTWORK NOTESADDITIONAL NOTES AND COMPLIANCESSTATEMENT OF COMPLIANCERETURN AIR PLENUM NOTESDRAWING INDEXDESCRIPTIONSYMBOLSIDE-WALL DIFFUSER - RETURN AIRSIDE-WALL DIFFUSER - SUPPLY AIRMETAL LINED FIBERGLASS DUCT CUBIC FEET PER MINUTEC.F.M.(PCV)PRESSURE CONTROL VALVESMOKE DETECTORTURNING VANESSDTWIST-IN COLLAR WITH DAMPEROUTSIDE AIRO.A.R.A.O.A.L.RETURN AIROUTSIDE AIR LOUVERCONDENSATE WATER PIPINGREFRIGERANT LIQUID LINETHERMOSTATTA = DIFFUSER TYPE, CFM = DIFFUSER AIR FLOWCEILING MOUNTED EXHAUST FANMANUAL VOLUME DAMPER(MVD)UNDERCUT DOORU.D.EXHAUST GRILLEE.G.MASTER ADVL LINEAR DIFFUSERDRONE ADVL LINEAR DIFFUSERDRSTATIC PRESSURE PROBE LOCATION MARKSTATIC PRESSURE PROBESPPLINEAR SLOT SELF-MODULATING VAVDIFFUSER - SUPPLY AIRCEILING DIFFUSER - EXHAUST AIRMECHANICAL LEGENDVDVOLUME DAMPERUL LISTED FIRE SMOKE DAMPERFSDMechanical General NotesM001http://www.beai.com
<br />PHONE: (305) 461-2053
<br />LICENSE No. AA26001612
<br />Miami, Florida 33168
<br />11575 Northwest 7 Avenue
<br />FAX: (305) 634-0599
<br />E-mail: info@beai.com
<br />BEA architects Inc.
<br />© a r c h i t e c t s
<br />CITY OF SUNNY ISLES BEACH
<br />18050 COLLINS AVENUE, SUNNY ISLES BEACH, FLORIDA 3316021-1011BUILDING DEPARTMENT RELOCATION
<br />TO ANNEXNOVEMBER 25, 2024PERMIT SETwww.hammondengineers.com499 N.W. 70thAvenue,Suite 215Plantation, Florida 33317THIS ITEM HAS BEEN DIGITALLY SIGNED AND
<br />SEALED BY JOHN GRAY CUMPER ON THE DATE
<br />ADJACENT TO THE SEAL. PRINTED COPIES OF THIS
<br />DOCUMENT ARE NOT CONSIDERED SIGNED AND
<br />SEALED AND THE SIGNATURE MUST BE VERIFIED
<br />ON ANY ELECTRONIC COPIES.
|