My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment B - Sunny Isles Bldg Dept Annex, Bid Set
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment B - Sunny Isles Bldg Dept Annex, Bid Set
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:15:56 AM
Creation date
2/20/2025 9:10:25 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K-6710WHITBYC_SINKSCAST IRON <br />K-6710WHITBYC_SINKSCAST IRON <br />21M3111WATER HEATERROOMELECTRICALROOMLIBRARY / FILES(FLOOR TO CEILING HEIGHT)LIBRARY / FILES <br />(FLOOR TO PARTITION HEIGHT)CLERK #2(INTERIOR NOT IN SCOPE)CAFEPLANPREPDESKCLERK #1037RESTROOMWOMENS038RESTROOMMALE039RESTROOMWOMENS042UNISEXRESTROOM040RESTROOMMALE041CLOSETJANITOR036CLOSETJANITOR035STORAGE034ADMINISTRATORBUSINESS CENTER028PLAN EXAMINERSR. BUILDING027INSPECTOR026INSPECTOR013INSPECTORBUILDING006ADMIN005ADMIN032SUPERVISORPERMITCALL CENTER011003BREAKROOM008INSPECTORCHIEF PLUMBING014ADMINISTRATORFLOOD PLAIN007INSPECTORCHIEF BUILDING018INSPECTORSR. MECHANICAL009INSPECTORCHIEF MECHANICAL021INSPECTORELECTRICAL016INSPECTORPLUMBING023INSPECTOR020INSPECTORSR. ELECTRICAL002MANAGERBUILDING DEPT.010INSPECTORCHIEF ELECTRICAL025PLAN EXAMINERSR. BUILDING024INSPECTOR004BUILDING OFFICIALASSISTANT017ROOMCONFERENCE019INSPECTORMECHANICAL015INSPECTORSR. PLUMBING001OR DIRECTORBUILDING OFFICIAL043WAITING AREA044LOBBY / ENTRANCE029IT ROOM033SUPERVISORBUSINESS CENTER022ROOMMEETING031COORDINATORPLAN030PLAN EXAMINERSTRUCTURE012INSPECTORSR. BUILDINGEXTEND AND CONNECT THE NEW COLD WATER LINES TO THE EXISTING COLDWATER MAIN, VERIFY IN FIELD (VIF).EXTEND AND CONNECT THE NEW 2" COLD WATER LINE TO THE EXISTING COLDLINE, PROVIDE THE LINE WITH SHUT-OFF VALVE AND A SEPARATE SUB-METER FORFUTURE TENANT. CONSULT WITH ARCH/OWNER PRIOR TO LOCATING SUB-METER.PROVIDE CAPPED 2" COLD WATER LINE IS JANITOR'S CLOSET OF FUTURE TENANT,THE WATER DISTRIBUTION FOR THE FUTURE TENANT AREA IS UNDER A SEPARATESCOPE OF WORK.123Plumbing Floor Plan - Dom. Water P201http://www.beai.com <br />PHONE: (305) 461-2053 <br />LICENSE No. AA26001612 <br />Miami, Florida 33168 <br />11575 Northwest 7 Avenue <br />FAX: (305) 634-0599 <br />E-mail: info@beai.com <br />BEA architects Inc. <br />© a r c h i t e c t s <br />CITY OF SUNNY ISLES BEACH <br />18050 COLLINS AVENUE, SUNNY ISLES BEACH, FLORIDA 3316021-1011BUILDING DEPARTMENT RELOCATION <br />TO ANNEXNOVEMBER 25, 2024BID SETwww.hammondengineers.com499 N.W. 70thAvenue,Suite 215Plantation, Florida 33317THIS ITEM HAS BEEN DIGITALLY SIGNED AND <br />SEALED BY JOHN GRAY CUMPER ON THE DATE <br />ADJACENT TO THE SEAL. PRINTED COPIES OF THIS <br />DOCUMENT ARE NOT CONSIDERED SIGNED AND <br />SEALED AND THE SIGNATURE MUST BE VERIFIED <br />ON ANY ELECTRONIC COPIES.PLUMBING FLOOR PLAN - DOMESTIC WATER SCALE: 3/16" = 1'-0"N
The URL can be used to link to this page
Your browser does not support the video tag.