Laserfiche WebLink
<br /> <br />THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 010110-1 <br /> <br />SECTION 010110 <br />SITE CONDITIONS <br /> <br />PART 1 - GENERAL <br /> <br />1.1 SITE INVESTIGATION AND REPRESENTATION <br /> <br />A. The Contractor acknowledges that he has satisfied himself as to the nature and location of <br />the work, the general and local conditions, particularly those bearing upon availability of <br />transportation; disposal, handling and storage of materials; availability of labor, water, <br />electric power, roads; disposal of water from construction; uncertainties of weather; the <br />conformation and conditions at the ground; the type of equipment and facilities needed <br />preliminary to and during the prosecution of the work and all other matters which can in <br />any way affect the work or the cost thereof under this Contract. <br /> <br />B. The Contractor further acknowledges that he has satisfied himself as to the character, <br />quality, and quantity of surface and subsurface materials to be encountered from <br />inspecting the site and from evaluating information derived from exploratory work that <br />may have been done by WASD or included with these Contract Documents. Any failure <br />by the Contractor to acquaint himself with all the available information will not relieve <br />him from responsibility for properly estimating the difficulty or cost thereof under this <br />Contract. <br /> <br />C. The Contractor acknowledges that by personal field observation or other means <br />satisfactory to himself, performed prior to the bid, he has included in the prices bid all <br />costs for dealing with all construction problems created by observable above or on grade <br />features on or adjacent to the site of the work whether these features are shown on the <br />Plans or described in the Specifications. In instances where the observable features <br />indicate subsurface conditions which may affect the Project work, as for example, a <br />pavement patch or catch basin gratings indicating respectively a utility or storm sewer <br />not shown on the Plans, the Contractor acknowledges that he has made timely, diligent, <br />inquiry of the Engineer or by other means fully satisfied himself prior to the bid as to the <br />nature of, and costs created by, the subsurface condition and included all costs therefore <br />in the prices bid. <br /> <br />1.2 INFORMATION ON SITE CONDITIONS <br /> <br />A. All information obtained by WASD regarding the site conditions, topography, subsurface <br />information, ground water elevations, existing construction of site facilities as applicable, <br />and similar data will be made available to the Contractor in the Contract Documents. <br />Such information is offered as supplementary information only. Neither the Engineer nor <br />WASD assumes any responsibility for the completeness or for the Contractor's <br />interpretation of such <br /> <br />B. supplementary information. Prior to bidding and after written approval from WASD, <br />bidder may make his own survey investigations to satisfy himself with site conditions at <br />his own cost. <br /> <br />C. Subsurface investigations, including test borings, have been made to indicate subsurface <br />conditions at locations in the Project. <br />