My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ERNEST
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
Responses
>
ERNEST CONSTRUCTION FL INC
>
ERNEST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 1:01:39 PM
Creation date
3/10/2025 12:59:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
305.988.8199 www.joinernest.com estimating@joinernest.com <br />Efficient and Coordinated Logistics <br />Safety and quality aren’t just a priority—they’re our moral duty. At Ernest, we embed a culture of safety and <br />quality from day one, empowering our teams to uphold the highest standards. Read more below on our proven <br />programs and training that drive real results. <br />Enabling Phase <br />Quality Assurance <br />Structure Through Completion <br />The enabling phase will encompass all preparatory work, including the construction of a new electrical substation, the <br />rerouting of all utilities, and the demolition of existing structures as required for the project. During this phase, we will <br />establish initial perimeter controls, set up construction trailers, and create a “Community Connector.” This Community <br />Connector will serve as an informational hub, providing updates and graphics to share relevant details with members of the <br />neighboring community. Existing structures designated for removal will be demolished as utility relocation permits allow. <br />The excavation phase will begin once utility relocation is complete, though sheeting, shoring, and excavation may start in <br />some areas while work continues elsewhere to accelerate progress. Construction access will be via Collins Avenue and <br />designated entry points. To reduce dump truck traffic in neighborhoods, haul routes will use controlled entry and exit points <br />on major roads. Coordinated truck access and logistics will ensure smooth operations. Effective planning will minimize <br />community impact, with key challenges including excavation coordination, traffic management, site stability, and strict safety <br />compliance. <br />Towards the end of the excavation phase, one tower crane will be installed to assist with unloading tractor trailers carrying <br />building supplies. Once the structure is complete, a construction material and personnel hoist will be installed to facilitate <br />material movement and efficient debris removal. Access to the construction site will be maintained via Collins Avenue and <br />designated entry points, with coordinated logistics to ensure smooth deliveries and minimize neighborhood impact. Traffic <br />management will be essential throughout this phase. Staging and lay-down areas to the east of the site will be critical for <br />optimizing construction efficiency, especially in areas with limited surrounding lay-down space. <br />Vehicular <br />construction traffic <br />management <br />1 <br />2 4 <br />Demo clean up <br />and disposal <br />Materials and <br />delivery access <br />Existing soil <br />bearing <br />pressures <br />Excavation for <br />grease trap and <br />helical piles <br />3 5
The URL can be used to link to this page
Your browser does not support the video tag.