Laserfiche WebLink
<br />City of Sunny Isles Beach |Request for Proposal No. 14-11-01 16 <br /> <br />Section 3 <br />Scope of Services / Technical Specifications <br /> <br />3.1 SCOPE OF SERVICES <br /> <br />Proposed are the roadway improvements for NE 174th Street to include all labor and material to <br />perform roadway reconstruction with geotechnical fabric, sidewalks, ADA ramps, detectable <br />warning surfaces, f-curbs, valley gutters, curb inlets, storm pipes, control structure, water quality <br />treatment structure, new asphalt, milling and resurfacing west of North Bay Road & within North <br />Bay Road south of NE 174th Street, and striping with all other associated work according to the <br />attachments. Proposed improvements also include full landscape and irrigation enha ncements <br />within the full right-of-way of NE 174th St. Final completion deadline for Proposer to finish all Work <br />is for two-hundred and seventy (270) days from issuance of notice to proceed from the City <br />Manager or his designee. Substantial completion shall be thirty (30) days prior to the final <br />completion deadline. Construction stakeout and as-built/record drawings will be provided by the <br />successful proposer, as will all other surveying services required for project completion and close <br />out. <br /> <br />If any portion of the contract documents or plans is not clear or contradictive, the proposer is to <br />submit a question/clarification in writing prior to submitting a bid proposal. In any instance where <br />the attached scope of work is in conflict with FDOT specifications the more stringent specification <br />will prevail. <br /> <br />Furthermore, Bid Items Descriptions preceded by “NBR” refer to items on North Bay Road south of <br />NE 174th Street and may be removed from the bid at Owner’s direction based on the schedule for <br />award and construction of the North Bay Road Pedestrian Emergency Bridge Project (RFP No 14- <br />09-01). <br /> <br />The contractor is also advised that the residential buildings within the NE 174th St Corridor (i.e. <br />Winston Towers 100, 200, 300, 400, 600 and 700) are currently undergoing their 40-yr <br />recertification. Temporary parking allowances have been permitted by the City to these buildings <br />to allow 24-hr curbside parking within the right-of-way of NE 174th St. Construction activities on <br />these buildings are anticipated to be on-going through at least August 2015. The successful <br />proposer shall be required to coordinate with the Buildings and their associated contractors; and <br />phase all right-of-way work related to this bid so that curb-side parking can be maintained as <br />previously agreed to by the City. Please refer to Attachment F provided. <br /> <br />END OF SECTON <br />