Laserfiche WebLink
ITB 25-06-01 HVAC Management System Preventative Maintenance <br />ADDENDUM # 2 - BIDDERS MUST USE THIS PRICE SHEET TO BE <br />CONSIDERED RESPONSIVE <br /># of <br />(6)Air Handlers <br />cations <br />LOCATIONS <br />Pumps <br />COST PER <br />TOTAL ANNUAL <br />QTY <br />MONTH <br />COST <br />1 <br />GC�VERNMNT CENTER;=1$070 Collins Avenue Sunny Isles.Beach.. <br />_ _. <br />(5) Air handlers <br />Regular filter <br />12 <br />(3) Mini split units <br />$ <br />(2)Condensor units <br />$ 18,000.00 <br />(4)Fan Coil Units <br />Pumps <br />FLEET BUILDING 18080 C011in"s Ave <br />Pipes/Valves/Belts <br />2,000.00 <br />Hepa Filter <br />(1) Fan Coil Unit <br />24,000.00 <br />400.00 <br />Rpgijlar Filter 12 <br />$ - <br />$ <br />TOTAL $247000.00 <br />4,800.00 <br />ANNUAL <br />2 <br />C[]VFRf11MFNT`ONNFX'11.IntlarC'riictr�irtirinl.�rn4il7n7�"_ <br />(6)Air Handlers <br />Pumps <br />Pipes/Valves/Belts <br />1,500.00 <br />Hepa Filter <br />18,000.00 <br />Regular filter <br />12 <br />$ <br />$ <br />$ 18,000.00 <br />TOTAL ANNUAL <br />s <br />FLEET BUILDING 18080 C011in"s Ave <br />. _ <br />SCOPE OF WORK: <br />(1) Fan Coil Unit <br />400.00 <br />Pipes/Valves/Belts <br />4,800.00 <br />Regular Filter <br />12 <br />$ <br />$ <br />TOTAL ANNUAL <br />$4,800 <br />4 <br />Building Department Modular Trailer -18080 Collins Avenue <br />4,800.00 <br />400.00 <br />1z <br />$ - <br />$ _ <br />TOTALANNUAL <br />$4'800 <br />