My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2348
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2348
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 3:14:03 PM
Creation date
12/30/2014 3:12:50 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2348
Date (mm/dd/yyyy)
12/18/2014
Description
Awd Bid 14-07-01, Agmt w/Lynx for Govt Ctr Maintenance and Repairs.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
requirement, specifications and plans, or provision of the Contract Documents, the following order <br />of precedence shall apply: <br />23.2 In the event of conflicts in the Contract Documents the order of precedence stated <br />below shall govern. <br />• Revisions to this Agreement shall govern over this Agreement; <br />• This Agreement shall govern over Addenda to RFP No. 14 -07 -01 and to RFP No. <br />14- 07 -01; <br />• Addenda to RFP No. 14 -07 -01 shall govern over RFP No. 14- 07 -01; and <br />• RFP No. 14 -07 -01 shall govern over Contractor's Proposal Response to RFP No. 14- <br />07 -01. <br />Where provisions of laws, codes, manufacturer's specifications or warranties or industry <br />standards are in conflict, the more restrictive or higher quality shall govern. <br />23.3 In the event of conflicts with the plans, specifications, drawings, notes, the priorities <br />stated below shall govern: <br />• Scope of Work and Specifications shall govern over plans and drawings; <br />• Schedules, when identified as such, shall govern over all other portions of the <br />plans; <br />• Specific notes shall govern over all other notes, and all other portions of the <br />plans, unless specifically stated otherwise; <br />• Larger scale drawings shall govern over smaller scale drawings; <br />• Figured or numerical dimensions shall govern over dimensions obtained by <br />scaling; <br />• Where provisions of codes, manufacturer's specifications or industry <br />standards are in conflict, the more restrictive or higher quality shall govern <br />23.4 In the event omissions in the Contract Documents are not complete as to any incidental <br />detail of construction or construction system or with regard to the manner of combining or <br />installing equipment, parts, or materials, such detail shall be deemed to be an implied requirement <br />of the Contract Documents. "Minor Detail" shall include the concept of substantially identical <br />components, where the price of each such component is small. The quality and quantity of the <br />equipment, material, or part so furnished shall conform to trade standards and be compatible with <br />the type, composition, strength, size and profile of the equipment, materials or parts otherwise <br />specified in the Contract Documents. <br />ARTICLE 24. NOTICES <br />Whenever either party desires to give written notice to the other, such must be addressed to the party <br />for whom it is intended at the place last specified; and the place for giving of notice shall remain <br />such until it shall have been changed by written notice given in accordance with the provisions of <br />this Article. Notice shall be deemed given on the date received or within 3 (three) days of mailing, <br />if mailed through the United States Postal Service. Notice shall be deemed given on the date sent <br />via facsimile. Notice shall be deemed given via courier /delivery service upon the initial delivery <br />date by the courier /delivery service. For the present, the parties designate the following as the <br />respective places for giving of notice: <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.