My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2349
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 3:14:18 PM
Creation date
12/30/2014 3:14:25 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2349
Date (mm/dd/yyyy)
12/18/2014
Description
Awd Bid 14-07-01, Agmt w/Lynx for Govt Ctr Generator Upgrades.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. 2014- 23 <br />A RESOLUTION OF THE CITY COiNINIISSION OF THE CITY OF <br />SUNNI' ISLES BEACH, FLORIDA, AWARDING REQUEST FOR <br />PROPOSALS NO. 14 -07 -01 AND ENTERING INTO AN AGREEMENT <br />WITH LYNX CONSTRUCTION MANAGEMENT FOR <br />GOVERNMENT CENTER GENERATOR UPGRADES, IN AN <br />AMOUNT NOT TO EXCEED FIVE HUNDRED SEVENTY -ONE <br />THOUSAND SEVEN HUNDRED NINETY -TWO DOLLARS <br />(S571,792.00) FROM THE TOTAL CONTRACT AtNIOUNT OF TWO <br />MILLION EIGHT HUNDRED SEVENTY -ONE THOUSAND SEVEN <br />HUNDRED NINETY -TWO DOLLARS AND SIXTY -SIX CENTS <br />(S2,871,792.66), ATTACHED HERETO AS EXHIBIT "A "; <br />AUTHORIZING THE MAYOR TO EXECUTE SAID AGREEMENT; <br />AUTHORIZING THE CITY iN1ANAGER TO DO ALL THINGS <br />NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING <br />FOR AN EFFECTIVE DATE. <br />WHEREAS, the City is in need of a contractor for major maintenance and repairs to <br />various City structures and facilities including Cite Hall, Commission Chambers, Pelican <br />Community Park and Heritage Park, and issued RFP No. 14 -07 -01 of which three (3) responses <br />were received: and <br />WHEREAS, the proposal submitted by Lynx Construction Management was determined <br />to be the lowest responsible and responsive bidder for repairs to the Government Center and the <br />Government Center Garage: and <br />WHEREAS, Lynx Construction Management is qualified, willing and able to provide the <br />desired services on the terms and conditions set forth herein: and <br />WHEREAS, while Lynx Construction Management's base bid total was 52.871.792.66. <br />for an overall repair project that included. in addition to Government Center Generator Upgrades, <br />the proposal also included repairs to the Government Center. and to Pelican Community Park and <br />Heritage Park: and <br />WHEREAS. the City Commission desires to award Bid No. 14 -07 -01 to Lynx <br />Construction Management, for major maintenance and repairs to various City structures and <br />facilities: and <br />WHEREAS. the Citv Commission desires to enter into an Agreement with Lvnx <br />Construction 1%4anagement for upgrading the generator at the Government Center with a new <br />1000 Kilowatt diesel generator installed in the existing structure at the southwest corner of the <br />Government Center surface parking lot along with required upgrades to existing electrical panels <br />and subpanels including waterproofing improvements to the existing structure housing the <br />generator including an allowance for the purchase of a trailer and needed electrical system <br />modifications that provides for using the existing 500 Kilowatt generator at Pelican Community <br />Park if needed. in an amount not to exceed Five Hundred Seventv -One Thousand Seven Hundred <br />Ninety -Two Dollars ($571,792.00), attached hereto as Exhibit "A ". <br />R2014- Len.\ Construction Generator At Goet Ctr RFP 14 -07 -01 Pare 1 or 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.