Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />THE CITY <br />6.1 Information. Services and Items Required from City <br />6.1.1 The "City". The City of Sunny Isles Beach, as represented by the City <br />Commission and its designees, which is the owner of this Project. <br />6.1.2 The City shall furnish to the Contractor, prior to execution of this Contract, <br />any and all written and tangible material in its possession concerning conditions below <br />ground at the site of the Project. Such written and tangible material is furnished to the <br />Contractor only in order to make complete disclosure of such material. <br />The City shall also furnish surveys, legal limitations, and utility locations (if known), and a <br />legal description, if available, of the Project site. <br />6.1.3 The Contractor is responsible for compliance with, and shall secure at its <br />expense, all municipal review, construction, and inspection permits, provided, however, <br />all City of Sunny Isles Beach review, construction, and inspection fees will be waived save <br />and except fees for inspection. <br />6.1.4 The City shall furnish the Contractor, free of charge, two (2) copies of <br />the Contract Documents for execution of the Work. The Contractor will be charged and <br />shall pay the City FIFTY Dollars ($50.00) per additional set of Contract Documents <br />which it may require. <br />6.2 City's Right to Stop Work <br />6.2.1 If the Contractor persistently fails or refuses to perform the Work in accordance <br />with this Contract, the City shall have the right, but not an obligation, to order the <br />Contractor to stop the Work, or any described portion thereof, until the cause for stoppage <br />has been corrected, no longer exists, or the City orders that Work be resumed. In such <br />event, the Contractor shall immediately obey such order. A stop work directive provided <br />under this paragraph shall not entitle the Contractor to an extension of the completion date <br />nor any financial compensation resulting from expenses due to delays caused by this Stop <br />Work directive provided said Stop Work directive is due to Contractor's actions or <br />inaction. <br />6.3 City's Right to Perform Work <br />6.3.1 If the Contractor's Work is stopped by the City under Paragraph 6.2, or if <br />the Contractor persistently fails or refuses to perform the Work in accordance with this <br />Contract, and the Contractor fails within three (3) days of such stoppage, failure, or refusal, <br />to provide adequate assurance to the City that the cause of such stoppage will be <br />eliminated or corrected, then the City may, without prejudice to any other rights or <br />remedies the City may have against the Contractor, proceed to carry out the subject Work. <br />In such a situation, an appropriate Change Order shall be issued deducting from the <br />Contract Price the cost of correcting the subject deficiencies, plus compensation for the <br />City's Representative's additional services, if any, and expenses necessitated thereby, if <br />COMTECH ENGINEERING, INC. 13 <br />