Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />contract documents in the field administration office including this document and current <br />as -built plans available for the City's access at all times. <br />ARTICLE VII <br />THE CONTRACTOR <br />7.1 Upon providing no less than forty-eight (48) hours' notice to the Contractor, the City <br />may conduct a pre -construction conference at a time and place set forth in the aforesaid notice. <br />ATTENDANCE AT ALL PRE -CONSTRUCTION CONFERENCE(S) IS MANDATORY AND <br />FAILURE TO ATTEND SHALL BE A MATERIAL BREACH OF THIS CONTRACT. <br />7.2 The Contractor shall perform no part of the Work, including ordering of material, at <br />any time without adequate Contract Documents or, as appropriate, approved Shop Drawings, <br />Product Data or Samples for such portion of the Work. If the Contractor performs any of the Work <br />knowing it involves a recognized error, inconsistency, or omission in the Contract Documents <br />without such notice to the City's Representative, the Contractor shall bear responsibility for such <br />performance and shall bear the cost of correction. <br />7.3 The Contractor shall perform the Work strictly in accordance with the Contract <br />Documents. The Contractor shall also be responsible for all cutting, fitting, or patching that may <br />be required to complete the Work or to make its several parts fit together properly. <br />7.4 Contractor's Professional Standard <br />7.4.1 City's engagement of the Contractor is based upon the Contractor's <br />representations to the City that: <br />(a) Contractor has carefully reviewed all Contract Documents prior to signing the Contract. <br />(b) Contractor is an organization experienced in, and qualified, willing, and able to provide <br />construction of the nature and type necessary to perform the Work; <br />(c) Contractor is authorized and licensed to do business in the State of Florida, Miami -Dade <br />County, and the City of Sunny Isles Beach; and <br />(d) Contractor shall furnish labor, material, equipment, and services (i) which <br />expeditiously, economically, and properly complete the Work in the manner most <br />consistent with the City's interests and objectives, (ii) in accordance with the Contract <br />Documents, and (iii) in accordance with the highest standards currently practiced by <br />persons and entities performing comparable labor, material, equipment, and services on <br />projects of similar size and complexity. <br />(e) Contractor certifies that the sum of the Contract Price and Contingency as set forth in <br />Paragraphs 4.1 and 4.2 is adequate to fully execute the Work as defined by the Contract <br />Documents. <br />7.4.2. The Contractor shall administer, manage, supervise, and direct the Work using <br />Contractor's best skill, effort, and attention. The Contractor shall be responsible to the City <br />for any and all acts or omissions of the Contractor, its employees and others engaged in the <br />Work on behalf of the Contractor. <br />COMTECH ENGINEERING, INC. 15 <br />