My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-3973
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-3973
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 4:28:55 PM
Creation date
3/9/2026 10:25:22 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-3973
Date (mm/dd/yyyy)
02/19/2026
Description
Approving Agreement w/ Comtech Engineering, Inc., for the Golden Shores Pump Station Rehabilitation Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />assign the Contractor's right, title and interest under terminated orders or <br />subcontracts to the City or its designee. <br />12.2.1.3 The Contractor shall transfer title and deliver to the City such <br />completed or partially completed Work and materials, equipment, parts, fixtures, <br />information and Contract rights as the Contractor has. <br />12.2.1.4 <br />(a) The Contractor shall submit a termination claim to the City and the City's <br />Representative specifying the amounts due because of the termination for <br />convenience together with costs, pricing or other data required by the City's <br />Representative. If the Contractor fails to file a termination claim within one (1) <br />year from the effective date of termination, the City shall pay the Contractor, an <br />amount derived in accordance with sub- paragraph (c) below. <br />(b) The City and the Contractor may agree to the compensation, if any, due to <br />the Contractor hereunder. <br />(c) Absent agreement to the amount due to the Contractor, the City shall <br />pay the Contractor the following amounts: <br />(i) Contract prices for labor, materials, equipment and other <br />services accepted under this Contract; <br />(ii) Reasonable costs incurred in preparing to perform and in <br />performing the terminated portion of the Work, and in terminating the <br />Contractor's performance, plus a fair and reasonable allowance for <br />overhead in the amount of seven percent (7%) of the Contractor's direct <br />costs, and a reasonable allowance for profit in the amount of ten percent <br />(10%) of the Contractor's direct costs (such profit shall not include <br />anticipated profit or consequential damages); and profit thereon (such profit <br />shall not include anticipated profit or consequential damages); provided <br />however, that if it appears that the Contractor would have not profited or <br />would have sustained a loss if the entire Contract would have been <br />completed, no profit shall be allowed or included and the amount of <br />compensation shall be reduced to reflect the anticipated rate of loss, if any; <br />(iii) Reasonable costs of settling and paying claims arising out of <br />the termination of subcontracts or orders pursuant to Subparagraph <br />12.2.1.2 of this Paragraph. These costs shall not include amounts paid <br />in accordance with other provisions hereof. <br />The total sum to be paid the Contractor under this Subparagraph 12.2.1 shall <br />not exceed the total Contract Price, as properly adjusted, reduced by the <br />amount of payments otherwise made, and shall in no event include <br />duplication of payment. <br />COMTECH ENGINEERING, INC. 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.