My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-3973
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-3973
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 4:28:55 PM
Creation date
3/9/2026 10:25:22 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-3973
Date (mm/dd/yyyy)
02/19/2026
Description
Approving Agreement w/ Comtech Engineering, Inc., for the Golden Shores Pump Station Rehabilitation Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />smorrisa,sibfl.net <br />aboileau n nlaw.com <br />If to the <br />Jose L. Sierra, President <br />Contractor: <br />Comtech Engineering, Inc. <br />7900 SW 57 Avenue, Suite 11 <br />Miami, FL 33143 <br />(305) 397-8283 <br />jsierragcomtechen .com <br />If to the <br />Fabricio Volpi <br />City's <br />Public Works Director <br />Representative: <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida <br />33160 <br />305-792-1930 <br />fvolpinsibfl.net <br />ARTICLE XV <br />WAIVER OF JURY TRIAL <br />15.1 City and Contractor hereby knowingly, irrevocably, voluntarily and intentionally <br />waive any right either may have to a trial by jury in respect to any action, proceeding, lawsuit <br />or counterclaim based upon the Contract, arising out of, under, or in connection with the <br />construction of the Work, or any course of conduct, course of dealing, statements (whether <br />verbal or written) or the actions or inactions of any party. <br />ARTICLE XVI <br />ARBITRATION <br />16.1 Any dispute, controversy or claim arising out of or relating in any way to the <br />Contract, including without limitation any dispute concerning the construction, validity, <br />interpretation, enforceability or breach of the Contract, shall be exclusively resolved by binding <br />arbitration upon a Party's submission of the dispute to arbitration. In the event of a dispute, <br />controversy or claim arising out of or relating in any way to the Contract, the complaining Parry <br />shall notify the other Party in writing thereof. Within thirty (30) days of such notice, management <br />level representatives of both Parties shall meet at an agreed location to attempt to resolve the <br />dispute in good faith. Should the dispute not be resolved within thirty (30) days after such notice, <br />the complaining Parry shall seek remedies exclusively through arbitration. The demand for <br />arbitration shall be made within a reasonable time after the claim, dispute or other matter in <br />question has arisen, and in no event shall it be made after two (2) years from when the aggrieved <br />parry knew or should have known of the controversy, claim, dispute or breach. <br />16.2 This agreement to arbitrate shall be specifically enforceable. A Party may apply to <br />any court with jurisdiction for interim or conservatory relief, including without limitation a <br />proceeding to compel arbitration. <br />16.3 The arbitration shall be conducted by one (1) arbitrator. If the Parties are not able <br />to agree upon the selection of an arbitrator, within twenty (20) days of commencement of an <br />COMTECH ENGINEERING, INC. 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.