My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-4016
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-4016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2026 1:36:21 PM
Creation date
5/11/2026 1:17:54 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-4016
Date (mm/dd/yyyy)
04/16/2026
Description
2nd Amnd to Agrmnt w/ Team Contracting, Inc., for installation of a New, Pre-Engineered Metal Building.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor's Price Proposal - Detail Continues.. <br />Work Order Number: 133446.00 <br />Work Order Title: City of Sunny Isles Beach - Public Works - New metal building <br />Doors & Windows <br />26 13 34 19 OD 004D 0004 MOD For 70' To 99 In Length Only, Add <br />$3,858.48 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 4,680.00 x 0.73 x <br />1.1294 <br />3,858.48 <br />27 13 34 19 00 OD40 0010 MOD For 30 PSF Live Load And 30 PSF (110 MPH) Wind Load, Add <br />$28,596.41 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 6,000.00 x 4.22 x <br />1.1294 <br />2e,596.41 <br />for 170 mph wind load <br />28 13 34 19 00 0040 0013 MOD For Each SF Of 24 Gauge Wall Panel, Add <br />$4,114.63 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 5,280.00 x o.69 x <br />1.1294 y <br />4,114.63 <br />29 13 34 19 00 0111 EA Single Door, Metal Frame Rough Opening <br />$1.324.55 <br />Quantity <br />Quantity Unit Price <br />Factor <br />Total <br />Installation <br />x 390.93 x <br />1.1294 <br />1,324.55 <br />30 13 34 19 00 0115 EA W x 14' Overhead Door, Metal Frame Rough Opening <br />$3,056.05 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 300 x 901.97 x <br />1.1294 <br />3,056.05 <br />31 13 34 19 00 0117 EA >12 To 18 SF, Window Opening, Metal Frame Rough Opening <br />$2,813.29 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 6.00 x 415.16 x <br />1.1294 <br />2.813.29 <br />Subtotal for Doors & Windows <br />$242,149.49 <br />Proposal Total <br />$261,970.46 <br />This total represents the correct total for the proposal. Any discrepancy between line totals, <br />sub -totals and the proposal total is due to rounding. <br />The Percentage of NPP on this Proposal: % <br />Contractor's Price Proposal - Detail Page 3 of 3 <br />9/10/2024 <br />308 <br />
The URL can be used to link to this page
Your browser does not support the video tag.