Laserfiche WebLink
CS-1 Number <br />Mod UOM-'. <br />Description : <br />LineTotal� <br />Electrical <br />18 26 51 16 00-0221 <br />EA <br />2 T8 Lamps, 1' x 4', Surface Mounted, Vandal Proof, Wraparound <br />$21,693.29 <br />Fluorescent Fixtures <br />Qty Unit Price Factor Total <br />Installation 60 X $320.13 X 1.1294 $21,693.29 <br />Contractor Notes: <br />EDSUN Wrap Around Lighting. <br />19 26 52 13 13-0003 <br />EA <br />3 Max Wattage At 90 Minutes, 3.6 Volt, Polycarbonate Housing, <br />$2,605.98 <br />LED Lamps, Commercial Emergency Light (Lithonia ELM2 LED) <br />Qty Unit Price Factor Total <br />Installation 10 X $230.74 X 1.1294 $2,605.98 <br />Contractor Notes: <br />Emergency Lighting. <br />20 26 52 13 16-0022 <br />EA <br />Double Face, Edge -Lit LED Exit Sign With Battery Back -Up <br />$1,478.70 <br />(Lithonia EDG-2-R-EL-M6) <br />Qty Unit Price Factor Total <br />Installation 4 X $327.32 X 1.1294 $1,478.70 <br />Contractor Notes: <br />EXIT SIGNS. <br />21 26 56 18 00-0010 <br />EA <br />13 Or 14 Watt Fluorescent, Vandal Resistant, Surface Mounted, <br />$745.91 <br />Rectangular Exterior Area Fixture <br />Qty Unit Price Factor Total <br />Installation 3 X $220.15 X 1.1294 $745.91 <br />Contractor Notes: <br />Edsun Lighting Wall Pack Exterior Lighting. <br />Subtotal for Electrical: <br />$48,133.73 <br />Engineer Services <br />22 01 22 20 00-0060 <br />HR <br />Principal Engineer <br />$4,020.66 <br />Qty Unit Price Factor Total <br />Installation 16 X $222.50 X 1.1294 $4,020.66 <br />Contractor Notes: <br />Mechanical Engineer Services to Address Building Department <br />Comments. <br />23 01 22 20 00-0060 <br />HR <br />Principal Engineer <br />$11,559.41 <br />Qty Unit Price Factor Total <br />Installation 46 X $222.50 X 1.1294 $11,559.41 <br />Contractor Notes: <br />Electrical Engineer Services to Address Building Department <br />Comments. <br />Subtotal for Engineer Services: $15,580.07 <br />Piles <br />24 01 22 20 00-0047 HR Senior Surveyor (Party Chief) $4,723.96 <br />Qty Unit Price Factor Total <br />Installation 96 X $43.57 X 1.1294 $4,723.96 <br />Contractor Notes: To Mark Pile Locations <br />25 03 11 13 00-0004 SF Pile Cap, Pier Or Spread Footings Foundation Wood Formwork $6,232.93 <br />Qty Unit Price Factor Total <br />Installation 1080 X $5.11 X 1.1294 $6,232.93 <br />Contractor Notes: Pile Cap Formwork. <br />26 03 11 13 00-0006 SF Grade Beams Or Duct Bank Foundation Wood Formwork $5,401.27 <br />Qty Unit Price Factor Total <br />Installation 978 X $4.89 X 1.1294 $5,401.27 <br />Contractor Notes: Grade Beam Formwork. <br />Contractor Price Proprosal Details - Category 3 of 6 <br />This report was not generated or reviewed by your Account Manager of The Gordian Group <br />