Laserfiche WebLink
This final amendment is necessary. Following the geotechnical testing conducted on -site, silty sand was <br />identified at a depth of approximately 2 feet. This unforeseen soil condition presents a significant <br />structural risk. Based on engineering recommendations, the installation of 110 helical piles is the only <br />viable solution to ensure the stability and integrity of the building. <br />In addition to the piling work, the following items need to be incorporated to meet installation and code <br />compliance requirements: <br />Design and Engineering Services, Structural, Fire, Mechanical and Electrical Work (panel, conduits, exit <br />signs, service outlets). <br />This final amendment also requests an additional 65 calendar days, extending final completion to July <br />30th, 2026. <br />FUNDING SOURCE: <br />Funds have been appropriated in Account No. 001-5-5393-463000-00000. <br />ATTACHMENTS: <br />Resolution <br />Second Amendment - TEAM Contracting <br />Item Number: 9.H <br />343 <br />