My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-4016
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-4016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2026 1:36:21 PM
Creation date
5/11/2026 1:17:54 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-4016
Date (mm/dd/yyyy)
04/16/2026
Description
2nd Amnd to Agrmnt w/ Team Contracting, Inc., for installation of a New, Pre-Engineered Metal Building.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This final amendment is necessary. Following the geotechnical testing conducted on -site, silty sand was <br />identified at a depth of approximately 2 feet. This unforeseen soil condition presents a significant <br />structural risk. Based on engineering recommendations, the installation of 110 helical piles is the only <br />viable solution to ensure the stability and integrity of the building. <br />In addition to the piling work, the following items need to be incorporated to meet installation and code <br />compliance requirements: <br />Design and Engineering Services, Structural, Fire, Mechanical and Electrical Work (panel, conduits, exit <br />signs, service outlets). <br />This final amendment also requests an additional 65 calendar days, extending final completion to July <br />30th, 2026. <br />FUNDING SOURCE: <br />Funds have been appropriated in Account No. 001-5-5393-463000-00000. <br />ATTACHMENTS: <br />Resolution <br />Second Amendment - TEAM Contracting <br />Item Number: 9.H <br />343 <br />
The URL can be used to link to this page
Your browser does not support the video tag.