Laserfiche WebLink
All sections must be filled in with a dollar value or N/A. <br />Description Qty / Detail Total Amount ($) <br />174th Street — Pole Décor Lump sum (pole count <br />TBD at site survey)$4,500.00 <br />172nd Street — Pole Décor Lump sum $5,000.00 <br />North Bay Road — Pole Décor (between 172nd & 163rd <br />Street)Lump sum $7,000.00 <br />Kings Point Drive — Pole Décor Lump sum $3,500.00 <br />Monument Signs (9)9 signs × $1,000/sign (C7 <br />outline + figures)$9,000.00 <br />Intracoastal Sports Park — Façade Lump sum (C7/C9 <br />architectural outline)$8,500.00 <br />Pedestrian Bridge (163rd WB)Lump sum $4,500.00 <br />Pedestrian Bridge (between 174th & 172nd Street) — Pole <br />Décor Lump sum $5,000.00 <br />GROUP 3 SUBTOTAL $47,000.00 <br />GRAND TOTAL — GROUPS 1 + 2 + 3 (Group 1 standalone = $220,285.00)$322,685.00 <br />* Grand Total reflects all three groups combined. Award will be made based on City's available budget of $200,000–$250,000. Groups 2 <br />and 3 are optional and may be awarded in full, in part, or by line item at the City's sole discretion. Group 1 standalone total: $220,285.00. <br />GROUP 4 — EVENT AT GATEWAY PARK (NOT PART OF HOLIDAY DÉCOR BUDGET) <br />Group 4 is not included in the holiday lighting décor budget and will be considered separately by the City. <br />Gateway Park Open Lawn — Light & Music Display <br />Nightly program, up to 2–3 <br />weeks, minimal lawn <br />damage <br />Design, setup & programming of synchronized light/music <br />system Lump sum $18,000.00 <br />On-site operation and monitoring (nightly, up to 21 nights)21 nights × $400/night $8,400.00 <br />Breakdown & removal at season end Included $0.00 <br />GROUP 4 TOTAL $26,400.00