Laserfiche WebLink
<br />23 <br />RFP 26-04-01 CITYWIDE HOLIDAY LIGHTING & DECORATING SERVICES <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br /> <br />GROUP 3 - RIGHT-OF-WAYS <br /> <br />A. 74th Street – Pole Décor <br /> <br />B. 172nd Street – Pole Décor <br /> <br />C. North Bay Road (between 172nd Street & 163rd Street) – Pole Décor <br /> <br />D. Kings Point Drive – Pole Décor <br /> <br />E. Monument Signs- 9 <br /> <br />F. Intracoastal Sports Park – Façade <br /> <br />G. Pedestrian Bridge (163rd WB) <br /> <br />H. Pedestrian Bridge (between 174th Street & 172nd Street) – Pole Decor <br /> <br />GROUP 4 - EVENT AT GATEWAY PARK <br /> <br />Event at Gateway Park (151 Sunny Isles Boulevard) – open lawn <br />Open to proposal – light/music display that can be repeated nightly for up to 2 weeks, minimal <br />damage to lawn. To be up for approximately 2 – 3 weeks. <br />3.2 MAINTENANCE OF TRAFFIC <br />This section is applicable to any task requested in this RFP that involves traffic of any kind. Any <br />Work performed in the public right-of-way will require the prior approval of the appropriate <br />public agencies. These public agencies include, but are not limited to, the City, Miami-Dade <br />County Public Works Department, and FDOT. The Proposer shall include all appropriate traffic <br />control devices that conform to an approved Maintenance of Traffic (MOT) plan. The cost of the <br />MOT shall be taken into consideration and all traffic control costs shall be a part of the unit price <br />bid and shall not be paid for separately. This shall apply throughout this entire RFP. <br /> <br />3.2.1 MOT OF RIGHTS-OF-WAY <br />Maintenance of Traffic shall be in accordance with the current edition of the Florida <br />Department of Transportation, Standard Plans and Specification for Road and Bridge <br />Construction, and the Manual on Uniform Traffic Control Devices, as minimum criteria. <br />This note should be included under all proposal items that may include work on both <br />FDOT and all City roadways. All traffic control costs shall be a part of the unit price bid <br />and shall not be paid for separately. <br /> <br />3.2.2 The awarded Contractor is responsible to have required FDOT certification, including but <br />not limited to those in Section 2.2.B, for initiating, installing, and maintaining all