My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-4018
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-4018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 1:02:18 PM
Creation date
5/28/2026 12:52:18 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Date (mm/dd/yyyy)
05/28/2026
Supplemental fields
Comment
Per John (IT) vendor still needs to execute certain pages.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRUNIFIED <br />TECHNOLOGIES1098111 <br />f <br />The purpose of the planning phase is to allow for the lead engineers from R2 to fully understand <br />both the technical and business requirements as it relates to how to technically configure the <br />equipment as it pertains to this SOW. R2 often uses technical workshops as the method for the <br />R2 lead engineer to come away with all of the information required to pre -configure, test, and <br />implement the solution. Client should be prepared to provide detailed information to the lead <br />engineer regarding the environment that pertains to this SOW. <br />If during a workshop it is determined that additional tasks are required to be performed by R2 <br />that are not outlined in this SOW or were not originally intended to be part of this project, a <br />change order at the end of this SOW will be utilized to make modifications to this project and <br />SOW. <br />R2 Responsibilities: <br />o Conduct a requirement gathering and technical workshops <br />Review current environment <br />m Create implementation strategy <br />Client Responsibilities: <br />® Be involved in the implementation strategy and provide information about the <br />requirements <br />o Approve implementation strategy <br />Required Resources: <br />m R2 lead engineer <br />9 Client project lead and technical representative(s) <br />Deliverables: <br />a Implementation plan and deployment schedule <br />Statement of Work page 7 of 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.