Laserfiche WebLink
JUUNIFIED <br />TECHNOLOGIES1006111 <br />Phase 3.7 - Golden Shores Park - ImpLernemation. and <br />In this phase, the focus is on replacing the existing access and edge switches with new 9000 and IE <br />platforms and introducing Layer 3 routing at the site. All physical installation, rack/stack, cabling, <br />and power work will be performed by the Client. R2 will perform all configuration, routing <br />updates, and cutover tasks remotely once the hardware is in place and reachable. <br />R2 Responsibilities: <br />Pre -stage edge IE3300 <br />• Validate switch hardware, software, licenses and firmware upgrade as needed - one <br />(1) edge switch (IE3300) <br />• Apply base configuration (mgmt IP, hostname, SNMP, etc.) <br />• Configure Vlans, routing and ports per approved design <br />Cutover from old edge switch to L3 capable 9350 <br />• Move gateways from core or aggregation switch up to the new site edge switch <br />• Enable BGP between new Edge switch and aggregation switches; Radio and fiber <br />• Tune BGP to prefer fiber links over radio, use radio links as backup paths <br />• Validate and test connectivity for all connected devices <br />Client Responsibilities: <br />® Perform all onsite physical tasks, including rack/stack, power, patching, grounding, and <br />cabling of the new switches <br />* Ensure the new switches are powered on, properly connected, and reachable via <br />management network before R2 begins remote work <br />Schedule required maintenance windows and coordinate any downtime impacts with site <br />personnel <br />* Assist in onsite validation during cutover (checking devices, patching issues, link lights, etc.) <br />at R2's direction <br />0 Participate in functionality testing and confirm successful operation after migration <br />Required Resources: <br />® R2 lead engineer <br />Client technical representative(s) <br />Deliverables <br />® Completed installation of the devices <br />Statement of Work page 16 of 40 <br />