My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-4018
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-4018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2026 9:58:06 AM
Creation date
8/6/2026 9:03:40 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-4018
Date (mm/dd/yyyy)
04/16/2026
Description
Ratifying Expenditure Funds w/ De Lage Landen Financial for Cisco Products & SOW w/ R2 Unified Technologies for related labor.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JKUNIFIED <br />TECHNOLOGIES8001811 <br />Phase 3.1 - Gyven MargolisPark - Implernentavidon and, <br />In this phase, the focus is on replacing the existing access and edge switches with new 9000 <br />platforms and introducing Layer 3 routing at the site. All physical installation, rack/stack, cabling, <br />and power work will be performed by the Client. R2 will perform all configuration, routing <br />updates, and cutover tasks remotely once the hardware is in place and reachable. <br />R2 Responsibilities: <br />0 Pre -stage edge.and access switches <br />• Validate switch hardware, software, licenses and firmware upgrade as needed <br />• Apply base configuration (mgmt IP, hostname, SNMP, etc.) <br />• Configure Vlans, routing and ports per approved design <br />9 Cutover from old edge switch to L3 capable 9350 <br />• Move gateways from core or aggregation switch up to the new site edge switch <br />• Enable BGP between new edge switch and aggregation switches; radio and fiber <br />• Tune BGP to prefer fiber links over radio, use radio links as backup paths <br />• Validate and test connectivity for all connected devices <br />Cutover from old access switch to new 9350 access switch <br />• Validate and test connectivity for all connected devices <br />Client Responsibilities: <br />0 Perform all onsite physical tasks, including rack/stack, power, patching, grounding, and <br />cabling of the new switches <br />* Ensure the new switches are powered on, properly connected, and reachable via <br />management network before R2 begins remote work <br />® Schedule required maintenance windows and coordinate any downtime impacts with site <br />personnel <br />Assist in onsite validation during cutover (checking devices, patching issues, link lights, etc.) <br />at R2's direction <br />0 Participate in functionality testing and confirm successful operation after migration <br />Required Resources: <br />R2 lead engineer <br />o Client technical representative(s) <br />Deliverables: <br />a Completed installation of the devices <br />Statement of Work page 19 of 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.