My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-4055
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-4055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2026 12:41:08 PM
Creation date
9/1/2026 12:40:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the difference between the fair market value of the Project as constructed and the fair <br />market value of the Project had it not been constructed in such a manner as 'to include <br />defective or nonconforming Work. <br />If the remaining portion of the unpaid Contract Price, if any, is insufficient to compensate <br />the City for its acceptance of defective or non -conforming Work, the Contractor shall, upon <br />written demand from the City, pay the City such remaining compensation for accepting <br />defective or non -conforming Work. <br />ARTICLE XI <br />CONTRACT TERMINATION <br />12.1 Termination by the Contractor <br />12.1.1. If the Work is stopped for a period of ninety (90) days by an order of any court <br />or other public authority, or as a result of an act of the Government, through no fault of the <br />Contractor or any person or entity working directly or indirectly for the Contractor, the <br />Contractor may, upon twenty (20) days' written notice to the City and the Engineer / <br />Architectlerminate performance under this Contract and recover from the City payment <br />for the actual reasonable expenditures of the Contractor (as limited in Subparagraph 10.3.2 <br />above) for all Work executed and for materials, equipment, tools, construction equipment <br />and machinery actually purchased or rented solely for the Work, less any salvage value of <br />any such items. <br />12.1.2. If the City shall persistently or repeatedly fail to perform any material <br />obligation to the Contractor for a period of thirty (30) days after receiving written notice <br />from the Contractor of its intent to terminate hereunder, the Contractor may terminate <br />performance •.under this Contract by written notice to the Engineer / Architect and the City. <br />In such event, the Contractor shall be entitled to recover from the City as though the City <br />had terminated the . Contractor's performance under this Contract for convenience <br />pursuant to. Subparagraph 12.2.1 hereunder. <br />12.2 Termination by the City <br />12.2.1. For Convenience <br />12.2.1.1. The City may for any reason whatsoever terminate performance under this <br />Contract by the Contractor for convenience. The City shall 'give written notice of such <br />termination to the Contractor specifying when termination becomes effective. <br />12.2.1.2. The Contractor shall incur no further obligations in connection with the Work <br />and the Contractor shall stop Work when such termination becomes effective. The <br />Contractor shall also terminate outstanding orders and subcontracts. The Contractor shall <br />Page 32 of 43 <br />87" <br />465 <br />
The URL can be used to link to this page
Your browser does not support the video tag.