My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-4055
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-4055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2026 12:41:08 PM
Creation date
9/1/2026 12:40:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a • ap��� f ;q • �r <br />4e j�F Loo4 ay <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 City Hall <br />(305) 949-3113 Fax <br />MEMORANDUM <br />TO: Honorable Mayor and City Commissioners <br />VIA: Stan Morris, City Manager <br />FROM: Fabricio Volpi, Public Works Director <br />DATE: August 20, 2026 <br />RE: Approval of a Third Amendment to Agreement with Nunez Construction, <br />I nc.A <br />RECOMMENDATION: <br />This item is presented for consideration by the City Commission. <br />REASONS: <br />Nunez Construction, Inc. was contracted by the City trough Contract No. 2024-7081 to purchase and <br />install an emergency generator and restoration of stucco walls at Gateway Park parking garage. <br />Although the stucco work and other repairs were completed on time, the generator has been delayed <br />due to product delays beyond the contractor's control. The generator was ultimately delivered to the <br />project site on August 4th, 2026. Due to the late arrival of the equipment from the manufacturer, the <br />contractor's remaining installation activities were delayed and cannot be completed within the current <br />contract term. The delivery delay was beyond the contractor's control and has consequently affected <br />the scheduled timeframe for the installation, testing, and final project completion. Therefore, an <br />extension of the contract term is necessary to provide sufficient time to complete the work. <br />At this time the City wishes to extend the contract term to establish November 24,2026, as the final <br />completion date for all remaining work, without additional compensation. <br />FUNDING SOURCE: <br />No funding is required.for approval of this item as funding is already committed to this contract. <br />ATTACHMENTS: <br />Resolution <br />Nunez Construction - Third Amendment.pdf <br />Item Number: 9.1 <br />425 <br />
The URL can be used to link to this page
Your browser does not support the video tag.