My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-0115 Regular City Commission Meeting
SIBFL
>
City Clerk
>
City Commission Minutes
>
2015
>
2015-0115 Regular City Commission Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2015 3:37:10 PM
Creation date
3/11/2015 3:37:07 PM
Metadata
Fields
Template:
CityClerk-City Commission
Meeting Type
Regular
Date (mm/dd/yyyy)
01/15/2015
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summary Minutes:Regular City Commission Meeting January 15,2015 City of Sunny Isles Beach,Florida <br /> 5. SPECIAL PRESENTATIONS <br /> 5A. Annual Report on the "State of the City" by Mayor George "Bud" Scholl. <br /> Action: Mayor Scholl presented the annual"State of the City"Address. Since he has only <br /> been in office a little over one month,much of the progress he will be discussing for this past <br /> year was completed under the leadership of former Mayor Norman Edelcup and the prior <br /> Commission. He said he is pleased to report that after eleven (11) years in office, Mayor <br /> Edelcup has left the City in great standing and we thank him again for his dedicated service. <br /> Mayor Scholl said the City's finances have never looked better. We once again lowered the <br /> millage rate to $2.6 per$1,000 of taxable value,representing the third year in a row that we <br /> have reduced this rate. Property values continue to soar, between increases in existing <br /> property values and new construction,our total property value has gone from$6.9 billion to <br /> approximately$8 billion,and we expect to see this trend continue. This tax base ensures that <br /> we can maintain an excellent position in three (3) critical areas of our City finances: 1) <br /> producing a general operating budget to maintain world class levels of service,and this past <br /> year our General Operating Budget totaled $44 million; 2) providing sufficient levels of <br /> funding to complete our current and future capital project needs, and this past year Capital <br /> Projects totaled $38 million; and, 3) maintaining a solid level of general and assigned <br /> Reserves, our"rainy day fund", currently at $19 Million, and he noted that Commissioner <br /> Aelion had pointed out that our target was$17 Million. We have always taken a conservative <br /> and responsible approach to our City finances. Our continuing goal will be to keep taxes as <br /> low as responsibly possible while maintaining appropriate funding for our financial stability. <br /> Mayor Scholl said this past year has been a busy and productive year for capital projects. <br /> Our Beach Renourishment efforts yielded 36,000 cubic yards of sand spread over our <br /> beachfront from Sands Point to the north end of the Golden Strand, alleviating a number of <br /> known hotspots for erosion on the beach. This was a very successful joint project between <br /> the City and Fortune International. City staff is consulting with coastal erosion experts to <br /> determine ways to mitigate the seasonal erosion patterns affecting our beachfront. Replacing <br /> sand is becoming more difficult and costly, therefore, focusing some major expertise on <br /> mitigation will be an upcoming priority. We have completed the replacement of ten (10) <br /> lifeguard stands and the expansion of our Ocean Rescue unit,resulting in our City having one <br /> of the safest beaches in Florida. <br /> Mayor Scholl said Gateway Park is well on its way to completion which is expected to be in <br /> August. Several of the Park's main elements are under construction including the 370-car <br /> parking garage, approximately 18,000 square feet of restaurant and general meeting space, <br /> and the performing arts stage. An elevated pedestrian bridge between the Park and North <br /> Bay Road over west bound Sunny Isles Boulevard is to be completed by November. Our <br /> State Legislature provided the City with a $500,000 grant for the performing arts stage at <br /> Gateway Park,and$500,000 in general appropriations for the 174 Street Stormwater Project. <br /> The Intracoastal Parks was completed but the south seawall collapsed in August and <br /> emergency repairs are underway,with the entire seawall expected to be completed by Spring. <br /> The next and major phase of our utility wire undergrounding has substantially moved <br /> forward. The plans to underground the overhead distribution and utility wires on Collins <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.