Laserfiche WebLink
270002-R1 <br /> Mr. Christopher Russo <br /> March 12, 2015 <br /> Page 4 <br /> in the marketplace. with focus on those top 5 or so technologies that have been reviewed and <br /> commented on by the Florida Department of Environmental Protection and the U.S. Army <br /> Corps of Engineers for potential application in the State of Florida. If the City wishes to <br /> further evaluate innovative technologies for potential incorporation into the local beach <br /> management plan, including meetings with product developers/manufacturers, design <br /> evaluation, cost/benefit/funding evaluation, permitting feasibility, etc., these!services will be <br /> provided under an addendum scope. The review will include a summary of recent <br /> "demonstration" projects permitted by the Florida Department of Environmental Protection. <br /> Fees for Part 1(g) are lump sum at S3,800.00 <br /> h. Permitting and Funding Strategy: Coastal Systems will consult with Miami-Dade County. <br /> as the local sponsor for the Federal Shore Protection Project that encompas'Ses the City, the <br /> Corps project manager for the Shore Protection Project, and the regulatory agencies that have <br /> environmental permitting jurisdiction over beach management projects in the City, to discuss <br /> the updated shoreline management recommendations relative to coordinated project <br /> design/implementation efforts and environmental permitting feasibility. <br /> Coastal Systems will consult with the County. FDEP, and federal agencies regarding <br /> potential funding opportunities for interim beach nourishment projects and/or coastal <br /> structural solutions, and provide strategic recommendations relative to independent City <br /> and/or partnered projects. This scope of work includes a joint City-County meeting to discuss <br /> alternatives relative to working within versus outside the Federal Shore Protection Project <br /> framework. The fee estimate provided is for an initial level of effort of approximately 37 <br /> hours (will vary depending on staff rate; see Rate Schedule) of consulting services; the City <br /> will be advised if additional scope/budget is required to address additional variables or <br /> evolving permitting/funding regulatory or legislative frameworks. <br /> Fees for Part 1(h) are hourly, not to exceed without City authorization S6,500.00 <br /> i. Addendum Report: An Addendum Report will be prepared to supplement and update the <br /> 2009 Report. The Addendum Report will summarize the data collection, current local beach <br /> management efforts, and coastal engineering analyses referenced above. Photographs, <br /> figures, and other documentation will be incorporated into the Report, or into the <br /> Appendices. as appropriate. Recommendations will be provided regarding the next steps in <br /> the process of evaluating shoreline stabilization design alternatives, potential strategic <br /> partnerships. funding and permitting strategies. costs and schedules. <br /> Fees for Part 1(i) are lump sum at S5.000.00 <br /> PART 2—CLIENT-DIRECTED MEETINGS <br /> Coastal Systems staff will prepare for and participate in up to approximately 16'hours (will vary <br /> depending on staff rate; see Rate Schedule) of conference calls and meetings with the Client to <br /> www.coastalsystems int.com <br />