My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kiewit Infrastructure South Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-09-01 Construction of the N. Bay Road Pedestrian Emergency Bridge
>
Responses
>
Kiewit Infrastructure South Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2015 10:54:55 AM
Creation date
4/21/2015 10:50:38 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction of the N. Bay Road Pedestrian Emergency Bridge
Bid No. (xx-xx-xx)
14-09-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Safety focus. To our team, safety is more than a core value; it is a way of life. We have one over - arching <br />safety philosophy: "Nobody Gets Hurt." This goes for our entire team, including subcontractors, City <br />personnel, and the public. With an Experience Modification Rating well below the industry standard, <br />we have a proven track record of working safe in numerous environments. We understand the safety <br />requirements of building this bridge and will develop a site - specific safety plan. <br />Quality commitment. Our corporate quality culture places a premium on delivering high quality and <br />long- lasting projects: we focus on "Building it Right the First Time." We have a long history of producing <br />aesthetically pleasing projects with an increased service life by incorporating time - tested best management <br />practice. In addition, we thoroughly understand and adhere to all requirements, regulations and priorities. <br />Scheduling specialists. One of our strengths is our ability to deliver complex projects on time despite <br />challenges such as adverse site conditions and changes in work scope. In addition to employing the latest <br />in technological tools, our team's dedication and experience will allow us to make immediate adjustments <br />to operations that will keep your timetable intact. This may involve adjustments in manpower and shifts, as <br />well as equipment and techniques. Going beyond the norm to meet deadlines is the way we operate. <br />Environmental emphasis. From building a bridge in the Everglades to adding roadway underpass <br />crossings for wildlife in the Florida Keys, Kiewit is no stranger to projects with extensive environmental <br />components and regulatory requirements. Being good corporate citizens and stewards of the environment <br />is a vital part of our core beliefs. As a result, we emphasize to all employees that environmental compliance <br />is everyone's responsibility, notjust the responsibility of a few individuals. Plus, we support this philosophy <br />by providing project specific environmental training before employees begin work on a project. <br />For all these reasons, we are the ideal team to build the North Bay Road Pedestrian Emergency Bridge. <br />We will make sure the entire building process and the end result works well for the City, residents and the <br />traveling public. We are ready to begin working with the City of Sunny Isles Beach immediately. If you have <br />any questions, please contact Project Director, Frank DiGilio, or myself. <br />Sincerely, <br />KIEWIT INFRASTRUCTURE SOUTH CO. <br />Benjamin J. Carnazzo <br />Senior Vice President, District Manager <br />Kiewit Infrastructure South Co. <br />13680 NW 5th Street, Suite 130 1 Sunrise, FL 33325 <br />P: 954 - 835 -2228 1 F: 954 - 835 -2335 <br />www.kiewit.com <br />@Kiewittonstrtction of the North Bay Road Pedestrian Emergency Bridge No. 14 -09 -01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.