My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2401
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2015 10:06:03 AM
Creation date
5/21/2015 10:05:39 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2401
Date (mm/dd/yyyy)
04/16/2015
Description
Award Bid 14-11-01 & Agmt w/Florida Engineering & Development for 174th St Roadway Improve
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- - CITY OF SUNNY(SEES BEACH . <br /> - - 18070 Collins Avenue <br /> Sunny Isles Beach, Florida 33160 " 'ie� , <br /> 305.947.0606 <br /> vrww.sibll.net .it r • ^`y <br /> vN <br /> - . _ 'N •. <br /> . .. <br /> }F ,Lo ti..._, <br /> c'`r of su:s c'4o,. <br /> CITY OF SUNNY ISLES BEACH <br /> NE 174TH STREET ROADWAY IMPROVEMENTS <br /> CSIB RFP NO. 14-11-01 <br /> CAS PROJECT NO. 14-1758 <br /> BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE <br /> A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM <br /> AND/OR UNIT PRICES. <br /> ITEM UNIT <br /> NO DESCRIPTION QUANTITY UNIT COST TOTAL <br /> 57 Type 7 Manhole Top w/USF 580 2 EA r57v��nn• .00 f 00. 00 <br /> � <br /> 58 FDOT Type C Inlet w/USF 5112-6143 4 EA 7r 60O. igrqa <br /> 6'x 6'Manhole Control Structure W/USF 580 <br /> 59 1 EA 11 O <br /> (2)& Concrete Weir fI�IQQ� lffr <br /> 60 NBR -Modified Type E Inlet w/USF 6608 1 EA r CCO�� 4 ,� <br /> 00 <br /> 61 6' Diameter Downstream Defender 1 EA 26,600% 2 5j 60.00 <br /> SUBTOTAL. STORMWATER STRUCTURES ITEMS 52-61 - $ '7b j CZ- <br /> . Ou <br /> STORMWATER PIPES 62-67 <br /> The price for each drainage pipe construction item shall include but not be limited to all labor,equipment and materials <br /> necessary to install and construct these items in accordance with these contract documents which include all saw cutting, <br /> _asphalt removal and disposal, excavation, de-watering where possible, de-watering & NPDES permits, including the <br /> I Request for Proposal No. 14-11-01 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.