My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications - Creation of a Cultural Master Plan
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 15-08-01 Creation of a Cultural Master Plan
>
Specifications - Creation of a Cultural Master Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 3:46:30 PM
Creation date
8/31/2015 3:43:22 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Creation of a Cultural Master Plan
Bid No. (xx-xx-xx)
15-08-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL REQUIREMENTS AND SUBMISSION DETAILS <br />A. Timing: The process to develop the Cultural Master Plan is expected to take six (6) to nine (9) <br />months, exclusive of RFP process. <br />B. Contents: Firms interested in responding to this RFP should prepare a brief and concise Proposal, <br />including the following sections: <br />1. Introduction - Present general introductory comments, including a purpose statement <br />describing your understanding of the proposed project and required services. <br />2. Work Plan - Formulate a work plan that clearly systematically identifies and describes all tasks <br />and subtasks necessary to complete the requirements set forth in Section II. Scope of Work <br />(Process & Deliverables). <br />3. Personnel and Experience - Prepare an organizational chart showing the names and titles of <br />the project manager, professional and supporting staff, sub - consultants, and other key <br />personnel that will be assigned to the project. <br />4. Cost Proposal - Prepare a not -to- exceed cost Proposal and provide a cost breakdown for each <br />task and subtask identified in the work plan. <br />5. Project Schedule - Prepare a schedule that illustrates the estimated timeline for completing <br />project tasks and subtasks. <br />Only written Proposals will be considered. All materials submitted shall become a part of the Proposal, and <br />may be incorporated in a subsequent contract(s) between the City and the selected proposer. Failure to <br />comply, other than as specifically permitted in the RFP, may disqualify a proposer from further <br />consideration. <br />C. Deadline for Submission: To be considered, Proposals must be received on or before 2:30 p.m., <br />October 1, 2015. <br />D. Where to Submit Your Proposal: The Proposal is to be delivered to: Sunny Isles Beach <br />Government Center, City Clerk's Office — 4th Floor, 18070 Collins Avenue, Sunny Isles Beach, <br />Florida, 33160 and the envelope containing the sealed Proposal must be clearly marked: <br />"IMPORTANT, PROPOSAL ENCLOSED" <br />Proposal No. 15 -08 -01 <br />CREATION OF A CULTURAL MASTER PLAN <br />OPENING DATE AND TIME: at 2:30 PM <br />E. Number of Copies: Please provide one (1) original, one (1) digital copy, and six (6) copies. Plainly <br />identify the respective documents. The reproducible copy is one which can readily be reproduced <br />through a photocopier; it should be unbound and unstapled. <br />City of Sunny Isles Beach I Request for Proposal No. 15 -08 -01 • <br />
The URL can be used to link to this page
Your browser does not support the video tag.