My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment A - 2015-3-13_Samson Park Technical Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment A - 2015-3-13_Samson Park Technical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:00:19 AM
Creation date
11/12/2015 9:46:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMSON OCEANFRONT PARK <br />CITY OF SUNNY ISLES <br />TECHNICAL SPECIFICATIONS <br />ESCUTCHEONS FOR PLUMBING PIPING 15097 - 1 <br />SECTION 15097 - <br /> <br />ESCUTCHEONS FOR PLUMBING PIPING <br />PART 1 - GENERAL <br /> <br />1.01 <br /> <br />SUMMARY: <br />A. Section Includes: <br />1. Escutcheons. <br />2. Floor plates. <br /> <br />1.02 <br /> <br />ACTION SUBMITTALS: <br />A. Product Data: For each type of product indicated. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.01 <br /> <br />ESCUTCHEONS: <br />A. One-Piece, Cast-Brass Type: With polished, chrome-plated finish and setscrew fastener. <br /> <br />B. One-Piece, Deep-Pattern Type: Deep-drawn, box-shaped brass with chrome-plated finish and spring-clip <br />fasteners. <br /> <br />C. One-Piece, Stamped-Steel Type: With chrome-plated finish and spring-clip fasteners. <br /> <br />2.02 <br /> <br />FLOOR PLATES: <br />A. One-Piece Floor Plates: Cast-iron flange with holes for fasteners. <br /> <br />PART 3 - EXECUTION <br /> <br />3.01 <br /> <br />INSTALLATION: <br />A. Install escutcheons for piping penetrations of walls, ceilings, and finished floors. <br /> <br />B. Install escutcheons with ID to closely fit around pipe, tube, and insulation of piping and with OD that <br />completely covers opening. <br />1. Escutcheons for New Piping: <br />a. Piping with Fitting or Sleeve Protruding from Wall: One-piece, deep-pattern type. <br />b. Chrome -Plated Piping: One-piece, cast-brass type with polished, chrome-plated finish. <br />c. Insulated Piping: One-piece, stamped-steel type. <br />d. Bare Piping at Wall and Floor Penetrations in Finished Spaces: One-piece, cast-brass type <br />with polished, chrome-plated finish. <br />e. Bare Piping at Wall and Floor Penetrations in Finished Spaces: One-piece, stamped-steel <br />type. <br />f. Bare Piping at Ceiling Penetrations in Finished Spaces: One-piece, cast-brass type with <br />polished, chrome-plated finish. <br />g. Bare Piping at Ceiling Penetrations in Finished Spaces: One-piece, stamped-steel type. <br />h. Bare Piping in Unfinished Service Spaces: One-piece, cast-brass type with polished, <br />chrome-plated finish. <br />i. Bare Piping in Unfinished Service Spaces: One-piece, stamped-steel type. <br />j. Bare Piping in Equipment Rooms: One-piece, cast-brass type with polished, chrome- <br />plated finish. <br />k. Bare Piping in Equipment Rooms: One-piece, stamped-steel type.
The URL can be used to link to this page
Your browser does not support the video tag.