My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment A - 2015-3-13_Samson Park Technical Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment A - 2015-3-13_Samson Park Technical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:00:19 AM
Creation date
11/12/2015 9:46:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMSON OCEANFRONT PARK <br />CITY OF SUNNY ISLES <br />TECHNICAL SPECIFICATIONS <br /> <br />SANITARY WASTE AND VENT PIPING 15150-8 <br /> <br /> <br /> <br />pressure of 1-inch wg <br />5. Repair leaks and defects with new materials and retest piping, or portion thereof, until satisfactory <br />results are obtained. <br />. Use U-tube or manometer inserted in trap of water closet to measure this <br />pressure. Air pressure must remain constant without introducing additional air throughout period <br />of inspection. Inspect plumbing fixture connections for gas and water leaks. <br />6. Prepare reports for tests and required corrective action. <br />3.10 <br />A. Clean interior of piping. Remove dirt and debris as work progresses. <br />CLEANING AND PROTECTION: <br />B. Protect drains during remainder of construction period to avoid clogging with dirt and debris and to <br />prevent damage from traffic and construction work. <br />C. Place plugs in ends of uncompleted piping at end of day and when work stops. <br />D. Exposed PVC Piping: Protect plumbing vents exposed to sunlight with two coats of water-based latex <br />paint. <br />3.11 <br />A. Flanges and unions may be used on aboveground pressure piping unless otherwise indicated. <br />PIPING SCHEDULE: <br />B. Aboveground, soil and waste piping NPS 4 <br />1. Service class, cast-iron soil pipe and fittings; gaskets; and gasketed joints. <br /> and smaller shall be any of the following: <br />2. Hubless, cast-iron soil pipe and fittings; CISPI heavy-duty hubless-piping couplings; and coupled <br />joints. <br />3. Copper DWV tube, copper drainage fittings, and soldered joints. <br />4. Dissimilar Pipe-Material Couplings: Shielded, nonpressure transition couplings. <br />C. Aboveground, soil and waste piping NPS 5 <br />1. Service class, cast-iron soil pipe and fittings; gaskets; and gasketed joints. <br /> and larger shall be any of the following: <br />2. Hubless, cast-iron soil pipe and fittings; CISPI heavy-duty hubless-piping couplings; and coupled <br />joints. <br />3. Dissimilar Pipe-Material Couplings: Shielded, nonpressure transition couplings. <br />D. Aboveground, vent piping NPS 4 <br />1. Service class, cast-iron soil pipe and fittings; gaskets; and gasketed joints. <br /> and smaller shall be any of the following: <br />2. Hubless, cast-iron soil pipe and fittings; CISPI hubless-piping couplings; and coupled joints. <br />3. Copper DWV tube, copper drainage fittings, and soldered joints. <br />4. Dissimilar Pipe-Material Couplings: Shielded, nonpressure transition couplings. <br />E. Aboveground, vent piping NPS 5 <br />1. Service class, cast-iron soil pipe and fittings; gaskets; and gasketed joints. <br /> and larger shall be any of the following: <br />2. Hubless, cast-iron soil pipe and fittings; CISPI hubless-piping couplings; and coupled joints. <br />3. Dissimilar Pipe-Material Couplings: Shielded, nonpressure transition couplings. <br />F. Underground, soil, waste, and vent piping NPS 4 and smaller shall be any of the following:
The URL can be used to link to this page
Your browser does not support the video tag.